Laserfiche WebLink
IUI LDERS <br />Job Proposal <br />1131 Jefferson Ave. <br />Louisville, CO <br />Total Cost - $65,200 <br />Includes: <br />$11,000 Asbestos Abatement allowance <br />All work shown on plans by JVA Consulting Engineers <br />dated 10/11/11 <br />All required permits <br />Removal of suspected asbestos - ceiling insulation and <br />ductwork in basement. <br />Remove carpet in basement and store off site. <br />Disconnect furnace and move aside to pour new concrete <br />pads, reconnect furnace and install new ductwork. <br />Add new insulation in attic - 14" fiberglass. <br />Patch cracks in ceilings - match as closely as possible. <br />Roofing to be Owens Corning Oakridge laminated asphalt <br />shingles. (Limited lifetime Warranty) <br />Repair of exterior stucco, match as closely as possible. <br />Rebuild fireplace chimney using existing materials, re- <br />point mortar joints and install new cap. <br />Labor to paint - $600 allowance <br />1200 Clark St., Ft. Collins, CO 80524 '' 970.490.5935 <br />