My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Historic Preservation Commission Agenda and Packet 2011 11 21
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
HISTORIC PRESERVATION COMMISSION
>
2005-2019 Historic Preservation Commission Agendas and Packets
>
2011 Historic Preservation Commission Agendas and Packets
>
Historic Preservation Commission Agenda and Packet 2011 11 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 3:08:15 PM
Creation date
12/12/2011 10:28:01 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
HPCPKT 2011 11 21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
down to the ceiling joists over the central bearingwall. Note that the capacity of <br />the load path from the new wall through the first floor and basement bearing lines <br />to the foundation would first need to be determined. Preliminary observations <br />indicate that the existing bearing line is suitable to support this new cripple wall, <br />although selective strengthening of the Basement level header beams should be <br />expected. <br />3. Support the rafters at mid-span with diagonal web members or sister the rafters <br />with engineered lumber. <br />4. Until repairs are performed, potential failures of portions of the roof framing could <br />occur if overloaded by snow or wind pressure. It is therefore recommended that <br />the roof framing be temporarily shored or that roof strengthening repairs be <br />performed as soon as possible. Snow exceeding 4 inches in depth should <br />immediately be removed from the roof. Snow removal should be performed from <br />ladders or a lift so that workers are not on the roof concurrently with snow. <br />“Further development of repair solutions is necessary to reliably estimate repair costs and <br />those costs should be estimated by a contractor experienced with this kind of work. <br />Similar repairs should also be considered over the Porch, since those rafters are also not <br />compliant with Code. <br />“Over the two smaller west portions of the house, the roof framing appears to be <br />functioning well without any signs of distress or deterioration. No repairs appear to be <br />necessary although a more thorough investigation may reveal other deficiencies.” <br />CONTRACTOR REVIEW: <br />The Planning Division and the Chief Building Official (CBO) contacted and met on site <br />with three (3) qualified contractors to discuss the HSA findings. Each contractor <br />commented on the extent of the project and stated the structural engineer has provided <br />a great level of detail on the drawings. At the time of the writing of this report, two of the <br />three contactors submitted bids. It is anticipated the third contractor will submit a bid <br />which staff will provide at the HPC meeting. One contractor provided a bid on a design <br />he believes will work outside of the structural engineer’s request. <br />Copies of the bids are attached and following is a summary outline of the bids. <br />Raimo Construction, Inc. <br />Raimo Construction provided a bid package based only on the engineering drawings <br />without checking any of the existing conditions. Due to unfortunate timing, Raimo <br />Construction was unable to visit the structure. <br />Scope: <br />A. Foundation work per plans $11,850 <br /> Cut and remove concrete slab <br /> Pour seven concrete piers <br />B. Alterations to Main Roof per plans $27,675 <br /> Remove cedar shakes and asphalt shingles <br /> Remove sheathing <br /> Install new roof shingle <br /> Disposal of all construction debris <br />C. Alterations to front and rear lower roof areas per plans $12,150 <br /> Remove cedar shakes and asphalt shingles <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.