My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Revitalization Commission Agenda and Packet 2011 12 12
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
REVITALIZATION COMMISSION
>
2004-2019 Revitalization Commission Agendas and Packets
>
2011 Revitalization Commission Agendas and Packets
>
Revitalization Commission Agenda and Packet 2011 12 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 10:18:28 AM
Creation date
12/19/2011 9:04:38 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
RCPKT 2011 12 12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ProjectOverview <br />INANUTSHELL <br />ImplementationPlanandtheHighway42 <br />CorridorPlanfromLockStreettoPaschalDrive. <br />Theworkeffortwillincludetwocomponents: <br />TheCityofLouisville,Boulder <br />County,theRegional <br />ADenverRegionalCouncilof <br />TransportationDistrict(RTD) <br />Governments(DRCOG)StationArea <br />andtheColorado <br />NextStepsImplementationPlanforthe <br />Departmentof <br />proposedFasTracksLouisvilleStation <br />Transportation(CDOT)havepartneredto <br />Area,specifically:aSouthStreet <br />improveHwy42,bothfor[ÒzÝz;xcitizens <br />connectionbetweenDowntown <br />andbusinessowners,andtoaddressregional <br />LouisvilleandtheRevitalizationDistrict <br />transportationneeds.Tothatend,schematic <br />acrosstheBurlingtonNorthernSantaFe <br />designs(30%constructiondrawings)willbe <br />(BNSF)rightofway;creatinga <br />producedfortheHwy42corridorbetweenLock <br />multimodalconnectiontothe <br />StreetonthesouthandPaschalDriveonthe <br />proposedRegionalTransportation <br />north.Theseimprovementswillinclude <br />District(RTD)stationwhileprovidinga <br />pedestrianandbicyclefacilities,roadway <br />regionalconnectionbetweenthe <br />improvements,andnewintersectiondesigns. <br />GoodhueDitchTrailandtheCoalCreek <br />Trailandfinalizingthepedestrian <br />The42Gatewayprojectwillalsocreateadesign <br />considerationsfortheRTDStationArea; <br />forapedestrianandbicycleconnectionacross <br />and <br />therailroadtracksatSouthStreet.This <br />Acontextsensitiveandmultimodal <br />connectionwillprovideagatewaybetweenthe <br />corridordesignandimplementation <br />RevitalizationDistrictandDowntownLouisville. <br />planforHighway42betweenLock <br />Thegatewaywillhelptospuractivityinthe <br />StreetandthenorthernCitylimits <br />RevitalizationDistrictbybuildingonthesuccess <br />(PaschalDrive). <br />ofDowntownLouisville. <br />The{t©;E;©©;7t|willbeselectedthrough <br />TheCityofLouisvilleisseekingtodevelopan <br />theprojectevaluationprocess,incorporating <br />integratedinfrastructureimplementationplan <br />inputfromallprojectstakeholders.A <br />whichadvancesthepublicoutreachand <br />committeeofwt©;-·t©·;©xrmadeupof <br />facilitation,planning,andpreliminary <br />representativesfromthedifferentstakeholder <br />engineeringnecessarytodefinethe <br />organizations,willbecreatedtoprovideinput <br />infrastructureneedsfortwoprojects:the <br />onkeydecisionsthroughouttheproject. <br />LouisvilleFasTracksStationAreaNextSteps <br />http://www.the42gateway.com/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.