Laserfiche WebLink
City of Louisville Planning Department <br />M <br />EMORANDUM <br />To: <br /> LRC Commissioners <br />From: <br /> Gavin McMillan, AICP, Planner III <br />Subject: <br /> Discussion of December SWOT Analysis Result <br />Date: <br />January 9, 2012 <br />At the December 12, 2011 LRC meeting, the consultant for the 42 Gateway <br />Project, Carrie Wallis from Atkins, led a strengths, weaknesses, opportunities, <br />and threats (SWOT) workshop. A draft summary of those comments is included <br />as an attachment to this memorandum.Staff recommends that the LRC discuss <br />the draft notes at the meeting, and provide any edits or changes to the <br />document. <br />The consultant is in the process of completing SWOT workshops with all of the <br />stakeholders in the Highway 42 Corridor.At the February LRC meeting, a full <br />summary of those workshops will be made available. <br />749 Main Street · Louisville, CO 80027 · 303.335.4592 · FAX 303.335.4550 <br />www.ci.louisville.co.us <br /> <br />