My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Minutes 2012 02 09
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2012 Planning Commission Agendas Packets Minutes
>
Planning Commission Minutes 2012 02 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:20 AM
Creation date
5/7/2012 10:45:21 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCMIN 2012 02 09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />February 9, 2012 <br />Page 3of 14 <br />Conflict of Interest and Disclosure: <br />None heard. <br />Staff Report of Facts and Issues: <br />McMillan provided the staff summary using a power point presentation with the <br />following information: <br />Discussed the Project Review Process: <br />1)Pre-application meeting held April 2011. <br />2)Applicant held a public meeting June 2011 at the Safeway site. <br />3)Original complete application received July 2011. <br />Discussed the types of applicationsto be reviewed: <br />1)Preliminary Subdivision Plat, Preliminary Planned Unit Development <br />(PUD) and Special Review Use (SRU). <br />Components of the Preliminary process include: Site Planning, <br />Density, Bulk and Mass and Concept level. <br />2)Final Subdivision Plat, Final PUD and Final SRU. <br />Components of the Final process include: materials, <br />landscaping, architecture and final design. <br />McMillan continued with a review of the PUD Site Plan with the following information: <br />1)Property is zoned Community Commercial (CC) and is subject to review by the <br />Louisville Municipal Code, the Commercial Development Design Standards <br />and Guidelines (CDDSG), the Mixed Use Development Design Standards and <br />Guidelines (MUDDSG) and the Downtown Handbook. <br />2)The project is planned to have 10,000 SF of retail, a publicplaza area and 195 <br />apartment units. <br />3)Discussion of access, pedestrians and traffic included: <br />a.Three (3) access points are planned to the site: <br />b.Centennial Drive and South Boulder Road will not be modified. <br />c.Sidewalks will be 8’ wide on South Boulder Road and 5’ wide on <br />Centennial <br />d.Traffic generated from the site is 60% less than an occupied grocery <br />store. <br />e.Right of way dedication for possible future deceleration lane. <br />4)Density and height discussion included: <br />a.195 apartment units proposed –66% will be 1 bedroom or studio. The <br />LMC maximum allowed is 127 units. <br />b.Requested height is 28 –54 feet: the LMC allows Commercial at 42 <br />feet, residential at 35 feet and residential high (RH) density zoning at 50 <br />feet. <br />c.Other factors to consider include: <br />Functionality (circulation, parking, storm water and utilities) <br />Impacts on the Public Realm <br />Impacts on Views <br />Impacts fromShadows <br />McMillan provided the following information about each building: <br />Building A: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.