My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Historic Preservation Commission Agenda and Packet 2012 04 16
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
HISTORIC PRESERVATION COMMISSION
>
2005-2019 Historic Preservation Commission Agendas and Packets
>
2012 Historic Preservation Commission Agendas and Packets
>
Historic Preservation Commission Agenda and Packet 2012 04 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 3:09:16 PM
Creation date
5/8/2012 9:06:58 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
HPCPKT 2012 04 16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
H ARTRONFT A SSOCIATESP .C . <br />ConceptDesign -ScopeofConstructionWork –Dated04/10/12 <br />Old LouisvilleInnRehabilitationandAddition <br />Page 2 of 3 <br />toopenupthisinterestingspacetopublicuse,highlightingh istoricartifactsofthebuilding <br />includingthetunnelentrances,re -laidexistingbrickflooring,theoriginalhandcrankelevator andotheruniqueaspectsoftheoriginalstructure.The brick foundations arein serious needof <br />repair,howeveritwouldb ebesttofindasolutionthatprovidesstructuralstabilizationand waterproofingfromtheoutsideofthebuilding.Thiscouldbeaccomplishedonthesouthand eastsidesaspartofthenewconstructionoftheadditionandimprovementstothesite(loadi ng <br />docketc.),howeverthewestandnorthsideswouldrequirecooperationoftheCitytoallow excavationandstructuralreinforcementtooccurontheCityproperty.Futureworkonthis <br />spaceforfunctionalusewouldincludeMEPsystemsandappropriatele veloffinishes. <br />BuildingEnvelope:Thebuildingenvelopeis sub -standardwithregardtoweatherprotectionand <br />energy conservation .Upgradestotheenvelope,includinginsulation,windows,doors,weatherstripping,roofassemblyandfoundationwaterproo fingshouldbeconsideredwherever possiblewithhighprioritygiventomitigationofwaterintrusion,aswellasenergyefficiencyand <br />performanceofthewatervapor retardersystems .Historicresearchshouldbecompletedwith regardtotheoriginalfene stration,includingwindowsthathaveapparentlybeenremovedand <br />thenon -historicfrontdoor.Restorationofsomekeyelementsoftheoriginalstructurewould <br />enhancethepreservationeffortandprovideopportunitiesforupgradingcertainelements.The <br />exteriorcouldalsoberestoredtoexhibitsomeoftheoriginaltrim,eavebracketsandother decorativeitemsthathavebeenremoved.Apaintanalysiscantelloftheoriginalpaintscheme <br />whichcouldalsoberestoredifdesired. <br />ElectricalSystem:The e lectricalsystemisantiquatedandinsomeareashazardousasnon - <br />groundedcircuitsexistinmanyareas,andtheconditionofthewiringissuspectwithregardto safety.Theelectricalserviceshouldbeevaluatedforcurrentandfuturedemands,andlig hting <br />shouldbereviewedforenergyefficiency. <br />FireSprinklersandAlarm:Thebuildingwouldbenefitfromafireprotectionsystemduetothe <br />constructiontype ,useofthebuilding andvalueoftheasset.Detectionandearlyfire <br />suppressionshouldbe includedinrenovationplans. <br />Plumbing Systems:Theexistingplumbingsystemisofvariousvintages,andtheentiresystem needsevaluation.Opportunitiesexistwiththebuildingadditiontoaddressplumbing infrastructureaswellasprovidingadequate ADAcompliant restroomfacilitieswhichwouldbe <br />accessibletopersonswithdisabilities,plusanadequatejanitor’sclosetandotherplumbing <br />upgradestotheexistingkitchenfacilities.Evaluatetapsizefornewrestroomfacilities. <br />HVACSystem:HVAC systemscontinuetorequireongoingmaintenanceandrepairs.Evaluate <br />usefullifespanofexistingequipmentanddeterminescopeofreplacementaspartofthisproject.Newequipmentshouldbelocatedonthenewadditionroof,awayfromtheprimarywesta nd <br />northfacadesofthebuilding.Thecurrentrooftopmountedequipmentshouldberelocatedor screenedaspartofthisproject. <br />General:Thekitchen,includingequipment,plumbingfixtures,coolers,andmuchofthe restaurantinfrastructureisinneed ofmodificationandupgradeforbetterflowandfunctionality, <br />and upgradesarerequiredfortheloadinginoffood,beveragesandsuppliesfor improved <br />employeesafety.
The URL can be used to link to this page
Your browser does not support the video tag.