My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 1996-39
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
1950-1999 Resolutions
>
1996 Resolutions
>
Resolution 1996-39
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 1:18:49 PM
Creation date
12/27/2005 4:16:32 PM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
IGA BVSD_Louisville Campus 1996
Doc Type
Resolution
Signed Date
6/18/1996
Ord/Res - Year
1996
Ord/Res - Number
39
Subdivision Name
Louisville Campus
Cross-Reference
BVSD K-12 Campus IGA
Monarch K-12 Campus IGA
Original Hardcopy Storage
7E6
Record Series Code
45.160
Record Series Name
Resolutions
Supplemental fields
Test
RES 1996-39
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
are no plans at this time for the expansion of 88th <br />Street. <br />b. In addition, the School District shall dedicate to the <br />City the water line and an easement for the maintenance <br />of the treated water line which is constructed by <br />School District at its expense within the School Campus <br />Parcel. <br />9. South 88th Street Public Improvements. The City will <br />reconstruct South 88th Street and associated public improvements <br />from Dillon Road to the intersection of Health Park Drive, at no <br />cost to the School District, to include the following: <br />a. Improvements will be constructed pursuant to the City's <br />public improvement standards that will accommodate <br />school bus traffic and appropriate sight distances. <br />b. Acceleration and deceleration lanes shall be <br />constructed as necessary at St. Andrews Lane and at <br />Health Park Drive intersection. <br />c. Installation of a pedestrian underpass under South 88th <br />Street to provide pedestrian access generally in the <br />northwest corner of the Property. <br />d. All roadway construction and surfacing (including <br />stripping and signage), traffic signals, street <br />lighting, curb, gutter and sidewalks as necessary. <br />e. Installation of an 18" water line in the South 88th <br />Street Right of Way from Dillon Road to Health Park <br />Drive. <br />f. The intersection at St. Andrews and S. 88th Street <br />shall be initially designed and constructed to <br />accommodate full turning movements to the Development <br />Parcels. However, future design or construction of the <br />intersection is subject to change as determined in the <br />discretion of the City. <br />The City shall not assess any costs of the foregoing improvements <br />to South 88th Street, or any costs of future South 88th Street <br />improvements, against the Property, the School District or the <br />owners or developers of the Development Parcels. <br />10. Sanitary Sewer Hookup. The City shall grant <br />permission, subject to adequate capacity, to tie the School <br />Campus Parcel and the Development Parcels to the existing <br />sanitary sewer manhole located on the west side of South 88th at <br />St. Andrews. The City grants permission to construct, subject to <br />June 27, 1996 <br />BVSD\GEN\BVSD2.RAE <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.