My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Study Session Agenda and Packet 2012 03 13
PORTAL
>
CITY COUNCIL RECORDS
>
STUDY SESSIONS (45.010)
>
2010-2019 City Council Study Sessions
>
2012 City Council Study Sessions
>
City Council Study Session Agenda and Packet 2012 03 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 11:48:38 AM
Creation date
6/8/2012 1:44:02 PM
Metadata
Fields
Template:
CITYWIDE
Original Hardcopy Storage
6C6
Supplemental fields
Test
SSAGPKT 2012 03 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAGE TWO <br />SUBJECT: UPDATE /DISCUSSION - THE 42 GATEWAY PROJECT — PURPOSE <br />AND NEED AND PROJECT GOALS <br />DATE: MARCH 13, 2012 <br />o Environmental evaluation <br />o Urban design evaluation <br />The coordination team and the project consultant have developed a purpose and need <br />statement for the project along with associated project goals for each of the two components of <br />the project (Attachment 2). Once approved by the project partners, the purpose and need <br />statement and project goals will be the document which guides the design, review, and <br />eventual selection of a preferred alternative for Highway 42 and the Gateway between Old <br />Town and the Revitalization District. <br />SCHEDULE <br />The following is an overview of the schedule of the project moving forward (See Attachment 3). <br />• March 21— Coordination Team meets to complete draft of Purpose and Need statement, <br />project goals, and evaluation criteria. <br />• April 18 (afternoon) — The Project Partners (Decision Makers from the City of Louisville, <br />CDOT, BOCO, CDOT, and RTD) meet to adopt the Purpose and Need statement, <br />project goals, and evaluation criteria. <br />• April 18 (night) — Public meeting to discuss the purpose and need statement, existing <br />conditions, and initial alternatives for the Gateway between downtown and the <br />revitalization district under the railroad tracks. <br />• April 19 - Begin to design alternative designs for Highway 42 and the Gateway between <br />downtown and the revitalization district under the railroad tracks. <br />• September through November - Initial Alternatives designed for Highway 42 and the <br />Gateway between downtown and the revitalization district and reviewed by the <br />Community, the Project Partners and the Louisville City Council <br />• November — 30% Design of the preferred alternative for the Gateway between <br />downtown and the revitalization district completed <br />• November 2012 through March 2013 — Refinement of initial alternatives and 30% <br />design of the preferred alternative for Highway 42 <br />ATTACHMENTS: <br />1. SWOT Results <br />2. Draft Purpose and Need Statement and. Project Goals <br />3. Schedule <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.