My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Study Session Summary 2012 04 24
PORTAL
>
CITY COUNCIL RECORDS
>
STUDY SESSIONS (45.010)
>
2010-2019 City Council Study Sessions
>
2012 City Council Study Sessions
>
City Council Study Session Summary 2012 04 24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 11:49:08 AM
Creation date
6/20/2012 10:53:09 AM
Metadata
Fields
Template:
CITYWIDE
Supplemental fields
Test
SSSUM 2012 04 24
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council <br />Study Session Summary <br />April 24, 2012 <br />Page 5 of 7 <br />• Need to proceed with more design work to take it to a 30% design. The <br />objective here would be to facilitate CDOT's approval as well as RTD's <br />approval. <br />• If we don't make the Phase 11 Improvements, we can inform CDOT of the <br />interchange design so they will stay away from the area in their <br />construction along US36. <br />• The DDI is not constructed anywhere else in Colorado. <br />• What do Louisville residents and merchants along McCaslin and in <br />Centennial Valley think of the project? Need to make sure the merchants <br />and business owners are aware and get their feedback. When the project <br />gets underway, we need to minimize disruption to their businesses. <br />• Need a huge public relations effort to inform the public. <br />• Centennial Valley and Colorado Technological Center (CTC) are only half- <br />way built out which could affect traffic numbers in the future. <br />Heather Balser, Deputy City Manager, asked Council if there are any other <br />issues that need to be addressed. <br />• Funding <br />• Realistic price tag — price tag needs to include all the supporting costs. <br />• Discuss with stakeholders and have a plan for outreach before going to <br />the 30% design, and City Manager Fleming agreed to involve Centennial <br />Valley merchants so that the impact of the construction is clearly <br />articulated and minimized to the best extent possible. <br />Update /Discussion — City Services Facility Improvements <br />Kurt Kowar, Public Works Director, presented an overview of the City Services <br />Facility Improvements Project which covered the long history of the project, the <br />update of the current project, renderings and cost. <br />In 2006, City staff took on the master plan for the City Services Facility (Shops) <br />located on Empire Road. The goal of the project was to bring offices and work <br />areas up to a minimum standard, provide additional heated indoor storage for <br />Parks and Recreation, create an additional conference /training room space and <br />rehabilitate existing aging structures. The price tag for these improvements was <br />$3.2 million and because funding of that size was not available at the time, the <br />master plan was not implemented. <br />In 2010, City staff began to revisit this project. Using the 2006 master plan as a <br />starting point, staff completed a detailed space assessment, a conceptual level <br />design and cost estimate. The estimated cost of the project is now at $7.2 <br />million. Staff is preparing to enter the final phase of design with a target date of <br />completing site improvements in late 2012 and construction to begin in 2013 with <br />expected completion in summer of 2013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.