Laserfiche WebLink
PUD ~~inal development Plan <br />and <br />Final Plat <br />Lets ~ & ~, BIoCk 4, The Busyness Center at CTC, Replat E <br />LEGAL ©ESCRIPTION. <br />Lots 2 & 3, Replat D, The Business Center at C.T.G., Louisville, Colorado (Existing} <br />Lats 2 & 3, Replat E, The Business Center at C.T.C., Louisville, Colorado (Proposed} <br />PROJECT AREA: <br />6.68 Acres <br />PROPOSED USE. <br />Any uses allowed in City of Louisville Industrial zone districts <br />PROJECT INTENT: <br />The Project proposes development of 2 detached single story buildings on individual adjacent lots. <br />The buildings are oriented with their street front facing 104r~' Avenue towards the east. Each building <br />entry includes a sidewalk connection to an existing detached sidewalk along 104tr' Avenue. Ali loading <br />and utility services are on the rear (west} of the buildings and are screened from view of the <br />commercial use adjacent to the north and Dogwood Street on the south. The Project anticipates joint <br />use of the proposed driveway access located near the common interior property line and cooperative <br />cross-access and parking between the two lots (see PROPERTY OWNERSHIP AND JOINT USE <br />AGREEMENTS below}. The Project also proposes adjustment of the current interior property line <br />between the lots to a location 8' north of its existing position. <br />LAND USE: <br /> Lot 2 Lot 3 Project <br />Building footprint 31,738 sf 31,738 sf 63,476 sf 25.7% <br />DrivewayslParkinglSidewalks 56,957 sf 55,517 sf 112,474 sf 45.7% <br />Landscaping __a _.mm 32 919 sf 38 428 sf 70 447 sf 28.6% <br />Site Area 124,115 sf 122,284 sf 246,399 sf 100.0% <br />BUILDING HEIGHT: <br />30 ft l 1 story maximum based on average height above grade <br />BUIL©ING AREA; <br />Lot 2 Lot 3 Project <br />Building Area 31,738 sf 31,738 sf 63,476 sf <br />