My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2007 09 04
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2000-2009 City Council Agendas and Packets
>
2007 City Council Agendas and Packets
>
City Council Agenda and Packet 2007 09 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 1:58:18 PM
Creation date
11/8/2007 11:42:56 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
1A4 1A5
Quality Check
11/8/2007
Record Series Code
45.010
Supplemental fields
Test
CCAGPKT 2007 09 04
Jump to thumbnail
< previous set
next set >
Stamp
ID:
1
Creator:
Created:
6/29/2009 11:35 AM
Modified:
6/29/2009 11:35 AM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PARKING: <br /> Lat 2 Lot 3 Project <br />Standard Parking 90 sp 86 sp 176 sp <br />NC Parking 2 so 2 sp 4 sp <br />Total Parking 92 sp 88 sp 180 sp <br />Average parking ratio SF1Space 345 360 352 <br />Average parking ratio Spaces/1000 SF 2,89 2.77 2.84 <br />Bicycle parking 8 sp 8 sp 16 sp <br />EXTERIOR MATERIALS: <br />1Nalls Painted precast concrete with accent reveals {minimum 4 colors} <br />Window Framing Aluminum storefront framing system <br />Glazing Tinted insulating glazing <br />Sloped Raaf Standing rib metal rcxofing <br />Flat Roaf EPDM rneml~rane reefing with river rack ballast <br />Mechanical Screen Painted vertical ribbed steel decking {if screening is required per IDDSG} <br />See exterior color renderings and exterior color samples submitted separately. <br />PROJECT PHASING: <br />Construction of at least one of the buildings will commence within 6 months fallowing approval of this <br />PUD by the City of Louisville {subject to availability of offsite sanitation facilities to be constructed by <br />ethers}, Site improvements and care and shell building construction will be complete within 9 months <br />following carnmencernent of construction. The schedule for construction of the second building, if not <br />cantemporaneaus with the first, will be based on favorable real estate market conditions. <br />EXTERIOR LIGHTING: <br />Pale mounted, wall mounted, Ballard and recessed exterior lighting locations and fixture specifications <br />are indicated on Sheet E1. <br />SIGNAGE; <br />The Project proposes 3 dauBle faced exterior lit project identification signs located as indicated an the <br />Site Plan. Monument signs shall be limited to 25 sf per face. Building mounted signage shall <br />conform to the Industrial Development C~esign Standards & Guidelines. <br />FUTURE TENANT FINISH; <br />Parking requirements will be reviewed during the building permit process for individual tenant <br />finishes. No tenant finish permits or certificates of occupancy will be issued if the combined parking <br />of the various uses as required by the IDDSG exceeds the total provided parking an the site. <br />PROPERTY OWNERSHIP ANIJ JOINT' USE AGREEMENTS. <br />Lots 2 and 3 are currently in common ownership. Should this circumstance change in the future, the <br />separate owners of Lats 2 and 3 will execute joint agreements far cooperative use of vehicular <br />access, internal sidewalks and drainage: facilities, <br />
The URL can be used to link to this page
Your browser does not support the video tag.