My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2007 09 04
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2000-2009 City Council Agendas and Packets
>
2007 City Council Agendas and Packets
>
City Council Agenda and Packet 2007 09 04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2021 1:58:18 PM
Creation date
11/8/2007 11:42:56 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
1A4 1A5
Quality Check
11/8/2007
Record Series Code
45.010
Supplemental fields
Test
CCAGPKT 2007 09 04
Jump to thumbnail
< previous set
next set >
Stamp
ID:
1
Creator:
Created:
6/29/2009 11:35 AM
Modified:
6/29/2009 11:35 AM
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
263
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public W'ork~; <br />DR,~Ir'JAGE REPURT <br />fi. The final report shah be signed and sealed by a professioflal engineer. <br />[Signed copies cf the final drainage report arcrmpany this resubmittai.] <br />2. in the report; add information concerning the trench drains along the west side of bath buildings. <br />Design capacity information far the trench drainage has been added to the repart3 <br />The drawing sheets are labeled C2 and C3. Please have the Erlglneer include Sheet G1 or revise the existing sheet <br />numbers accordingly. <br />[The sheet numbers have been reviss:d as requested.] <br />UTiL l TY PLAN <br />The water ,'u;e loop an site sflall be 1rivately rnair?twined because it dues riot provide a tlydrautic benefit to the City's <br />existrrg system. Relocate the `~-2" wafer services and tap the existing 8" fire hydrant tines {upstream #rorn fhe hydrant <br />tee) afarlg S. 1f14"~ St. The engineer shad it?elude a line size gate va;ve downstream learn each fire hydrant, The fire <br />hydrant may need to be renaaved and relocated westerly data to fire exfsling location of the hydrant fee (back. of curb) <br />and Ghe proposed wafer sen~ice tap laaatierr. The w~:ter reefer shall be installcad within; the buildings and be within ~i1 ff <br />farm the paint of entry into fhe buiidih;~. <br />i'he water loop has baer~ eiirninated. AlE proposed waver Imes are now private as requested.] <br />The desigrl of the narffi/safrth sanitery sewer main as shas~n shall be revised to inctu,;e rune sewer fate into the south <br />manhole anc~ one sewer top into the nor`flerly nlanflole. Tfris revision will change the obligation for mairlter?ance of tl?e <br />r1aRt~sauth sanitary sewer to the property owners. The extent of the privately rnair?tained sanitary sewer services shall <br />designated an the plan. <br />[Due to crossing Canfiiats with existing utilities; the sr~uttaern property service must be as shown. `fhe sanitary sourer <br />has not been revised per Jtry 27~ m~,rting with the City. City miry request that sanitary services tie directly to main in <br />S. ~IG4~' pending their assessment of the condition of the existing street) <br />~. The dawrlsfreatr7 Sar?itary Sewef" /nafn 1S rrot cannecfed to tl?£ f1e4M `t t)'"rt~' St. Sallitafy Sewer lr'ft station. Tfie CorlStriiCtian <br />of tf?e buildings sf?aft net occur unfX tte new lift station is canstrucfed. <br />[>~ note has been added ttr the utility plan, and the ovrner is aware of the cnndition.) <br />~. The Engineer slyall indicate or1 the site plan the location of access Chives art tr';e south and west side of tt?e property. <br />>'3tat7 mrny request realignment of access paints if appropriate. <br />[call-cuts for the access drives have been added to the utility pian.~ <br />5 The Fire I'~arstrall shall review the plan far ire hydrant spacing. <br />[Acknowledged, <br />8, The Developer shall provide crass let access easements through fhe pafking lots and drives of each new building. <br />[An access easement has been added as requested.] <br />7. The leaped water main vrill be dasiggnated as privately maintained and hence a water lane utility easement will be <br />required because both let owners will be responsible far line maintenance. <br />[?he leaped main has been eliminated, therefore eliminating the need far ari easement.] <br />~. The storm sewer main between ponds 'and 2 shalt be designated as privately main?fairled. Paul, can a privately <br />maintained utility be located within a public utility easan?enf? An easement far the private stornf sewer impravernent <br />may else be required. <br />j'i"he storm sewer has been revised anti designated as private, and an easement has been added as requested per <br />July 27t~ meeting with the i;ity and s:ibsequent phone canversaUan with the City.J <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.