Laserfiche WebLink
9. Pr;nr to the request far completion of utility canstructlon, t~evelaper shall video tape storm sewer main upstream of ~. <br />7~~rj' St. manha{"e and sar;itary sewer services and rernave all constnrefion debrisidirt: <br />[,acknowledged.] <br />`tJ. The iMngir;eer skirl!! include S. 1U?;~ Street pavement marking an the utility plan. Also; the street name fnr ~~~~~ shall be <br />5auth 1G4~, Street. <br />[Existing stree# pavement marking has been aased to the plans as requested. <br />91. Add surraundiny develapmerrt infarrr3atian j? at; Stock, Subdivision, etc,} to the plan. <br />[Subdivision infarrr~atian has been aased to the lot and black inforntatian #or ttre adjacent properties.) <br />TCPCGRAPNiC h~tAP C7F tCTS 2 Ai11D :~ <br />1. The sidewalk at ttae snutheast corner of the site appears to be an private property. The developer shalt provide a <br />sidewalk easement at all encraachmant lncatians (9' min, fran, edge of walk), <br />[ A sidewalk easement has been added as requested, see revised ptat.j <br />2. Nave the Engh7eer indicate the 10` strip ref property at edge of right of way a 1d' utility and drainaae easement. <br />[The utility ins drainae easement call-out has been revised as necessary.; <br />CivAJBf,'AL COl`yth9clilT <br />i . The property owner also awns l..ats 4 and 5, Black ~ -- Business Center at CTC. Staff reouests a copy of tre recorded <br />water maim easement through the praper#y. if the utility easement does not exist then the awner shall provide a <br />preliminary daauent far review by thr= Gity prior fa recording with Boulder County. <br />[This inforrnatian Is being researched ~t this tune.; <br />Planning Department: <br />At~;~ <br />1. Shaw a detail fdr the type ar~d sty's of bike racks. <br />[Please refer to Dwg O~IArJ:'s,j <br />~. Please provide mare arnhitectr;ral detail an the entry way to break up the duplicative lank of the entry whys. <br />[Based an our foitowrp teiephan,~ car}versatiara, please rifer to ar;cnmpanyir7cd color board A05 far a aorr~parison of tree <br />proposed exterior color scheme and ;gin alternate which madifres application of the exterior color palette in the central <br />entry bay of each building.] <br />3. Include a detail of haw the monument sign wall be designed. <br />[Please refer to ~rwg 03iAU3 for monument sign size and canst~untion.j <br />4. Provide a aalnr iaq far the trash enclosure. <br />['r'lease refer to Dv;g 02iAg3.j <br />Ll'i3 <br />t?a you anticipate the future need fnr a backup generatar~ This war,ld ba a good time fa plan fnr a lncatian far this and <br />to provide an enclosure detail. <br />[Tr,e provision of a kaack~rip 3enr:ratcr ar exterior storage) slang wfh the associates enclosure would occur in response <br />to a specific future tenant's pees which vie cent currently anticipate. Nawever; we appreciate your foresight in <br />reaorrrmending that we inclose a specification for the exterior finish and location of such enclosures at this time. <br />Please refer to Pion Nate 3 rn Gvg Q11Ag1 far leration and area limitation of future enclosures, and l~wgs 01iA0A and <br />~2IA04 for typica3 enclosure a!evaticns.~ <br />f'~ae 3 cf ~ <br />