Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
RAMP Pre-Application, Page 2 of 6 <br /> <br />Key components (check all that apply): <br />☐ Bridge ☒ Roadway <br />☒ System preservation ☒ Traffic Management/Engineering <br />☒ Safety ☒ Transit <br />☒ Environmental ☐ Other, Specify: <br />State Highway/Interstate: SH 42 Mileposts (Begin/End): 1.35-2.951 <br />Location Description: Area within 300 feet of SH 42 right of way between Lock Street and Paschal Drive in <br />Louisville, CO. <br />CDOT Engineering Region (1-5 ): Four Counties: Boulder County <br />TPR/ MPO: DRCOG <br />STIP# (if applicable): SR46606.0312 STIP Year(s): 2013 <br />Project is part of a multi-phased (STIP) corridor program? ☐ YES ☒ NO <br />IF YES, describe: <br />Is this project included in a fiscally-constrained Regional Transportation Plan (RTP)? ☐ YES ☒ NO <br />If YES, identify funding source(s) assigned in RTP: <br /> <br /> <br />Demonstrate the project’s consistency with CDOT’s Long-Range Statewide Transportation Plan and CDOT <br />Policies: <br />The identified improvements fall under all four of CDOT’s primary investment categories; Safety, System <br />Quality, Mobility, and Program Delivery. Safety improvements include closing off dangerous access points and <br />reducing conflict points through an access management plan. The indentified intersection improvements <br />enable safer pedestrian crossings at key locations, and bicycle lanes provide facilities for cyclists where they <br />currently do not exist. The proposed auxiliary lanes and intersection improvements will improve system <br />quality and improve mobility for all travel modes in the corridor. Together, these improvements will make the <br />corridor a complete street with enhanced mobility for all users which will enhance the successful delivery of <br />CDOT’s programs, projects and services. <br /> <br />Is the project on Interstate or State Highway? ☒ YES ☐ NO <br />If NO, demonstrate how this project is integrated with the State Highway System. (CDOT reserves the right to <br />determine eligibility) <br /> <br />PROJECT READINESS/SCHEDULE <br />Project construction (implementation) will be completed by December 2017 ☒ YES ☐ NO <br />NEPA class action ☒ CE ☐ EA ☐ EIS Date completed <br />or… <br />…Anticipated <br />completion date <br />NEPA <br />Milestone/document <br />completed: <br />DEIS ☐ n/a <br />EIS ☐ n/a <br />ROD ☐ n/a <br />EA ☐ n/a <br />FONSI ☐ n/a <br />CE (part A+B of form 128) ☐ n/a 2014