Laserfiche WebLink
those issues are not in conformance with the Contract Documents. <br />i. CDOT will conduct a final walk through of the Project with the Local Agency <br />prior to final acceptance. CDOT will require the Concessionaire to address <br />all issues identified by the Local Agency as a result of such final walk <br />through prior to CDOT's acceptance of the Project provided such <br />issues are consistent with the requirements of the Plans. <br />h. make no further changes in the Plans following the award of the construction <br />contract except by agreement in writing between the parties. The Plans shall <br />be considered final when approved and accepted by the parties hereto, and <br />when final they shall be deemed incorporated herein. <br />B. Construction [if applicable] <br />1. If the work includes construction, the responsible party shall perform the <br />construction in accordance with the approved design plans and /or administer the <br />construction all in accord with the Local Agency Contract Administration Checklist. <br />Such administration shall include project inspection and testing; approving sources <br />of materials; performing required plant and shop inspections; documentation of <br />contract payments, testing and inspection activities; preparing and approving pay <br />estimates; preparing, approving and securing the funding for contract modification <br />orders and minor contract revisions; processing contractor claims; construction <br />supervision; and meeting the Quality Control requirements of the FHWA /CDOT <br />Stewardship Agreement, as described in the Local Agency Contract Administration <br />Checklist. <br />2. If the State is the responsible party: <br />a. it shall appoint a qualified professional engineer, licensed in the State of <br />Colorado, as the State Agency Project Engineer (SAPE), to perform that <br />administration. The SAPE shall administer the Project in accordance with <br />this contract, the requirements of the construction contract and applicable <br />State procedures. <br />b. if bids are to be let for the construction of the Project, the State shall, in <br />conjunction with the Local Agency, advertise the call for bids and upon <br />concurrence by the Local Agency will award the construction contract(s) to <br />the low responsive, responsible bidder(s). <br />(1) in advertising and awarding the bid for the construction of a federal - <br />aid project, the State shall comply with applicable requirements of 23 <br />USC § 112 and 23 CFR Parts 633 and 635 and C.R.S. § 24 -92 -101 et <br />seq. Those requirements include, without limitation, that the <br />State /contractor shall incorporate Form 1273 in its entirety verbatim <br />into any subcontract(s) for those services as terms and conditions <br />therefore, as required by 23 CFR 633.102(e). <br />(2) the Local Agency has the option to concur or not concur in the <br />proposal of the apparent low bidder for work on which competitive <br />Page 5 of 12 <br />