Laserfiche WebLink
11 <br /> PUBLIC WORKS <br /> DEPARTMENT <br /> WATER AND VEHICLE AND <br /> WASTEWATER EQUIPMENT <br /> DISTRIBUTION MAINTENANCE <br /> While no water or sewer line replacement or The Vehicle and Equipment Maintenance Division is <br /> upgrading was budgeted for 1982, completion of responsible for preventative maintenance and repair of <br /> Phase II of the Superior interceptor line enabled us to city vehicles from the motor grader down to weed <br /> serve the southwest portions of the city. Departmental eaters. During 1982, this division maintained: 24 light <br /> efforts were focused primarily upon maintenance of vehicles(cars and pickups), 10 heavy vehicles, 5 pieces <br /> the existing water distribution and wastewater of heavy equipment (tractors, loader, motor <br /> collection systems. Many man-hours were spent in grader), 8 pieces of stationary equipment <br /> installing water taps in the newly developing areas of (compressors, generators, pumps), and 17 pieces of <br /> the city. mowing equipment. <br /> Three department employees participated in a <br /> voluntary certification program and received <br /> certificates acknowledging their abilities in operation <br /> and maintenance of water and wastewater distribution <br /> systems. <br /> ,ar rte i,' , ''''; .,4.,, 6 ',' , <br /> 41*. , , , <br /> .� > <br /> . i <br /> It 1 <br /> 1 <br /> t ..f <br /> { a‘1.11' y L l4Alygf 3itQ <br /> 0 <br /> r <br /> 11.0 <br />