My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Study Session Agenda and Packet 2013 09 10
PORTAL
>
CITY COUNCIL RECORDS
>
STUDY SESSIONS (45.010)
>
2010-2019 City Council Study Sessions
>
2013 City Council Study Sessions
>
City Council Study Session Agenda and Packet 2013 09 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 11:50:22 AM
Creation date
10/17/2013 2:04:52 PM
Metadata
Fields
Template:
CITYWIDE
Original Hardcopy Storage
6C6
Supplemental fields
Test
SSAGPKT 2013 09 10
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY COUNCIL COMMUNICATION <br />AGENDA ITEM II <br />SUBJECT: UPDATE/DISCUSSION - PLANNING COMMISSION 2013 2014 <br />WORK PLAN <br />DATE: SEPTEMBER 10, 2013 <br />PRESENTED BY: TROY RUSS, AICP AND SCOTT ROBINSON, PLANNING AND <br />BUILDING SAFETY DEPARTMENT <br />SUMMARY: <br />Each year the Planning Division discusses its draft Work Plan with the Planning <br />Commission and City Council. The table below shows the current status of the 2012- <br />2013 Work Plan and the proposed Work Plan for 2013-2014. Staff asks the Planning <br />Commission and City Council to discuss the proposed 2013-2014 goals. <br />2012/2013 Work Plan Item Status <br />Comprehensive Plan Adopted <br />LMC. Modifications - Flood Hazard Update: Done <br /> - Public Notification Procedure Update: Council Study Session in <br />July -Drafting Code Changes <br />- Subdivision Re-Plat Criteria: In process <br />- Tele-Comm / CMRS Regs: On Hold <br />- Dark Sky Ordinance: On Hold <br />Transportation Planning - US 36 Managed Lane Project & DDI (On-going coordination 2013- <br /> 2015): Reviewing Final Design of Phase II. <br />- Hwy 42 Gateway Project (Hwy 42. 30% Design - April 2013): <br />Adopted. Completing Final Design of Gateway Applied for CDOT <br />funding for HWY 42 completion. <br />- Neighborhood Plans / Safe Route to School Evaluating Safe <br />Routes Grant options beginning work in 2013 <br />Urban Design - Downtown Patios: New patios designed and installed <br /> - McCaslin Branding & Wayfinding: Included in small area plan <br />- Downtown Parking Identification: On hold <br />- Downtown Newspaper Vending Machines: Proposed in 2014 <br />budgeting process <br />Historic Preservation - Downtown Survey: Completed August, 2013 <br /> - Processing Landmark Requests: Ongoing. As of today, 6 <br />Landmarks in 2013 <br />Urban Agriculture - White Paper Backyard LSAB completed draft proceeding with backyard chickens <br />Chickens ordinance. Planning Commission scheduled 9-12-13 <br />Current Planning Complete <br /> - Pearl Izumi: Final PUD/Plat <br />- Safeway: Preliminary / Final PUD and Plat <br />- Coal Creek Station (Arnold Property): Preliminary PUD, Plat and <br />Rezoning <br />- DELO: Preliminary PUD, Plat and Rezoning <br />- North End Block 10: Final PUD/Plat <br />McCaslin Small Area Plan Beginning in November <br />CITY COUNCIL COMMUNICATION <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.