My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2014 01 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
GOLF COURSE ADVISORY BOARD
>
2014 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2014 01 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:05 PM
Creation date
1/14/2014 10:25:30 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2014 01 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />Hole by Hole Analysis <br />GOLF COURSE <br />Louisville, CO <br />Hale 12 <br />Repair fairway /rough areas damaged <br />by flooding: <br />Strip sod, remove silt, regrade for <br />positive surface drainage, and <br />regrass (— 29,000 sf) [R: 24,000 sf] <br />Realign cart path and <br />widen at the green. <br />Cart Path: 4' x 30' <br />Curbing: 40 If <br />Convert 52,450 sf of out -of -play <br />area to low - maintenance turf in <br />conjunction with hole 8 <br />Strip sod, level 960 sf tee <br />and regrass <br />Relocate and mitigate <br />forward tee with 25' x 30' <br />tee to improve playability <br />120'19 <br />Rebuild bunker: <br />Remove contaminated sand, replace drainage, <br />restore edges (lower to improve visibility), add <br />new sand and regrass surrounds. <br />Bunker: 640 sf <br />Exernal tile: 100 If <br />Sod: 1,950 sf <br />Repair 5,350 sf green and surrounds: <br />Strip sod, remove silt, remove "collar dam" <br />add greensmix, regrade and regrass <br />Shorten fairway to <br />reduce maintenance <br />Reconstruct tees <br />Strip sod, reshap tee <br />surface, add rootzone <br />mix and re- grass. <br />Back: 30' x 30' <br />Middle Back: 35' x 80' <br />Sod: 4,650 sf <br />Repair fairway /rough and pond bank areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive surface drainage, and <br />regrass (— 43,450 sf in conjunction with hole 11) [R: 24,000 sf] <br />Rebuild and shift bunkers: <br />Remove contaminated sand, replace drainage, <br />restore edges, add new sand and regrass surrounds. <br />Bunker A: 2,065 sf <br />Bunker B: 460 sf <br />External tile: 200 If <br />Sod: 8,675 sf <br />32 <br />KEY <br />Storm Damage Improvement <br />Golf Course Improvement <br />Recommendations <br />Date: January 7, 2014 <br />0 100 200 <br />300 FT <br />
The URL can be used to link to this page
Your browser does not support the video tag.