My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2014 01 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
GOLF COURSE ADVISORY BOARD
>
2014 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2014 01 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:05 PM
Creation date
1/14/2014 10:25:30 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2014 01 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ilole by Hole Analysis <br />GOLF COURSE <br />Louisville, CO <br />Hole 13 <br />Reconstruct and elevate tees <br />Strip sod. elevate and reshape tee <br />surface, add rootzone mix and re- grass. <br />Back Tee: 25' x 25' <br />Middle Back Tee: 40' x 70' <br />Strip sod, level 2,215 sf tee <br />and regrass <br />Strip sod, level 2,040 sf tee <br />and regrass <br />Convert 45,500 sf of out -of -play <br />area to low- maintenance turf <br />Construct new 25' x 30' <br />forward tee <br />Relocate and elevate bunker to mitigate future flooding: <br />Remove contaminated sand, replace drainage <br />(including "exit" drains and sumps, restore edges, add <br />new sand and regrass surrounds. <br />Bunker: 2,070 sf <br />External tile: 100 If <br />Sod: 12,000 sf <br />Topsoil: 20 cy <br />Rebuild bunker: <br />Remove contaminated sand, replace <br />drainage (including "exit" drains and <br />sumps, restore edges, add new sand <br />and regrass surrounds. <br />Bunker: 1,500 sf <br />Extemal tile: 100 If <br />Sod: 4,350 sf <br />Realign cart path and <br />widen at the green. <br />Carl Path: 4' x 50' <br />Curbing: 70 If <br />Repair areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (« 2,000 sf) <br />Realign cart path and widen at the tee. <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Repair areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (— 47,000 sf) <br />[R: 12,000 sf[ <br />Create collection areas, add catch basins <br />and pipe to improve poor drainage area. <br />Use soil to elevate tees. <br />Catch Basins: 2 ea <br />Draintile: 230 If <br />Create collection area, add catch basin <br />and pipe to improve poor drainage area. <br />Use soil to elevate tees. <br />Catch Basins: 1 ea <br />Draintile: 170 sf <br />Repair 4,455 sf green: <br />Strip sod, remove silt, <br />remove "collar dam" add <br />greensmix, regrade and <br />regrass <br />13 ©f 19 <br />r <br />0 <br />Rebuild bunker: <br />Remove contaminated sand, replace <br />drainage (including "exit" drains and <br />sumps, restore edges, add new <br />sand and regrass surrounds. <br />Bunker: 1,665 sf <br />External tile: 50 If <br />Sod: 2,150 sf <br />33 <br />KEY <br />Storm Damage Improvement <br />Golf Course improvement <br />Recommendations <br />Date: January 7, 2014 <br />Q 100 200 <br />00 FT <br />
The URL can be used to link to this page
Your browser does not support the video tag.