My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Golf Course Advisory Board Agenda and Packet 2014 01 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
GOLF COURSE ADVISORY BOARD
>
2014 Golf Course Advisory Board Agendas and Packets
>
Golf Course Advisory Board Agenda and Packet 2014 01 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2021 2:43:05 PM
Creation date
1/14/2014 10:25:30 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
GCABPKT 2014 01 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.Hole by Hole Analysis <br />ef,redt <br />GOLF COURSE <br />Louisville, CO <br />Hole 14 <br />Add fairway bunker to <br />define the landing area. <br />Bunker: 1,540 sf <br />External tile: 150 If <br />Topsoil: 10 cy <br />Sod: 2,350 sf <br />Remove selective trees, including <br />cottonwood, to improve safety and <br />sightline to the landing area - by owner <br />Add catch basin with draintile to <br />improve drainage. <br />Catch Basin: 1 ea <br />Draintile; 100 If <br />Repair 6,231 sf green: <br />Strip sod, remove silt, <br />add greensmix, regrade <br />and regrass <br />Rebuild 1,985 sf tee: <br />Strip sod, remove silt, regrade tee <br />surface, add rootzone mix and reseed <br />Rebuild 3,400 sf tee: <br />Strip sod, remove silt, regrade tee <br />surface, add rootzone mix and reseed <br />Rebuild 3,400 sf tee: <br />Strip sod, remove silt, regrade tee <br />surface, add rootzone mix and reseed <br />Shorten fairway to <br />reduce maintenance <br />Repair areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (— 5,000 sf) <br />Widen fairway to define <br />the landing area <br />Replace cart <br />path to tunnel <br />Add catch basins <br />Catch Basin: 2 ea <br />Draintile: 350 If <br />Widen cart path at tees <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Construct new 25' x 30' forward tee <br />Repair leaking overflow pipe <br />Repair areas damaged by flooding: <br />Strip sod, remove silt, regrade for positive <br />surface drainage, and regrass (— 18,500 sf) <br />[R: 20,000 sf] <br />Re -line pond and repair overflow structure <br />h draintile to improve drainage_ <br />(14 <br />140 <br />r9 <br />Widen cart path at green <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Regrade 27,500 sf of fairway /rough to <br />improve playing surface and drainage <br />Add catch basin <br />Catch Basin' 1 ea <br />Draintile: 175 If <br />h draintile to improve drainage. <br />Rebuild bunker: <br />Remove contaminated sand, reduce size to improve maintenance, <br />and shift closer to the fairway, replace drainage, restore edges, add <br />new sand and regrass surrounds. <br />Bunker: 1,900 sf <br />Extemal tile: 125 If <br />Sod: 6,615 sf <br />Rebuild greenside bunkers: <br />Remove contaminated sand, replace drainage, <br />restore edges, add new sand and regrass <br />surrounds. <br />Bunker A: 330 sf <br />Bunker B: 420 sf <br />External tile: 200 If <br />Sod: 2,900 sf <br />34 <br />KEY <br />[Storm Damage Improvement <br />Golf Course Improvement <br />Recommendations <br />Date: January 7, 2014 <br />0 100 200 300 FT <br />
The URL can be used to link to this page
Your browser does not support the video tag.