Laserfiche WebLink
i iiiiii iiiii ii~iiii iii iiiiiii iiii iiiiii iii iiiii iiii iiii ?~~ ~ ~~~ <br />04/25/2007 02.45P <br />Boulder County Clerk, CO AG R 56.00 D 0.00 <br />(identified as Property No. 2), the Self Parcel (identified as Property No. 3), the Games Parcel <br />(identified as Property No. 4), the Johnson Parcel (identified as Property No. 5), and the <br />Archdiocese Parcel (identified as Property No. 6). <br />c. "City": the City of Louisville, Colorado. <br />d. "City Policy": refers to the Charter, Code, rules, regulations, standards <br />and policies of the City, including; the City's Design and Construction Standards as may be <br />applicable, as the same maybe amended from time to time. <br />e. "Constructio:n Acceptance": construction acceptance of the Project by the <br />City in accordance with Section 2.4 of this Agreement. <br />f. "District": the C"olorado Tech Center Metropolitan District. <br />g. "Engineering; anal Construction Phase": that phase of the Project more <br />specifically addressed in Article 2 o:f this Agreement. <br />h. "Final Acceptance": final acceptance of the Project by the City in <br />accordance with Section 2.5 of this .Agreement. <br />i. "Final Plans and Specifications": the plans and specifications for <br />construction of the Project as designed a.nd approved by the City Engineer in accordance with City <br />Policy. <br />j. "Parties": refers jointly to the City and the District. <br />k. "Project": the clew lift station and related improvements, including but <br />not limited to the extension of gravity .sewer and force mains, as more specifically identified in <br />Exhibit A. <br />1. "Reimbursement Fee": the fee to be imposed and collected by the City <br />from properties located within the Benefited Area in accordance with Article 3 of this Agreement. <br />m. "Reimbursement Phase": that phase of the Project more specifically <br />addressed in Article 3 of this Agreerent. <br />n. "Total Reimbursement Amount": means the Total Reimbursement <br />Amount as set forth in Exhibit C attached hereto. <br />ARTICLE 2 <br />ENGINEERING AND CONSTRUCTION PHASE <br />2.1 Payments for En~ine;erin~ and Construction Costs. The District shall pay the <br />Actual Capital Costs for the Project. T'he District shall maintain accurate records of the Actual <br />Capital Costs incurred by the District for the Project. <br />