Laserfiche WebLink
IIIIII IIII IIIIII III VIII IIII IIII 251499 <br />IIIIII VIII IIIIIII IIi i 04/25/2007 02.45P <br />Boulder County Clerk, CO AG R 56.00 D 0.00 <br />2.2 Construction and Completion. <br />a. All construction shall be subject to receipt by the District of all necessary <br />governmental approvals and shall be contracted for and completed in accordance with City <br />Policy, the City's Design and Construction Standards as applicable, and other applicable <br />regulations of governmental entities having jurisdiction. <br />b. Upon comple;tion of the Engineering and Construction Phase, the District <br />shall provide the City a copy of al:l construction records, including but not limited to materials <br />testing reports, contracts, engineer':; daily reports, and drawing submittals, as well as the as-built <br />drawings for the Project. District also shall provide all equipment warranties, operation manuals, <br />start up training, and any other materials or information pertaining to the operation and <br />maintenance of the Project. <br />c. The District s~hala make available to the City for review and comment prior <br />to finalization any and all proposed construction contracts, change orders, and other construction <br />contract-related documents, and as-built drawings concerning the Project. <br />d. The District shall diligently and continuously prosecute to completion the <br />construction of the Project; unless the; existence of a force majeure event, as defined below, <br />prevents the District from completing the Project on schedule, in which case the District shall <br />notify the City of such force majeure event and shall diligently and continuously prosecute to <br />completion the construction of the Project following the resolution of such force majeure. <br />The term "force majeure eve;nt," as used herein, shall mean an act of God, strike, lockout, <br />or other industrial disturbance, act of the public enemy, war, blockade, public riot, lightning, fire, <br />storm, flood, explosion, governmental restraint, unavailability of equipment, and any other <br />cause, whether of the kind specifically enumerated above or otherwise, which is not reasonably <br />within the control of the District. <br />2.3 No City Obli a~ The City shall have no obligation whatsoever to contribute <br />financially for work performed for the Project. Nothing herein, however, shall be construed to <br />prevent the start of the Reimbu.rse~ment Phase, with the Reimbursement Phase running <br />concurrently with the completion of~the: Engineering and Construction Phase. <br />2.4 Completion of Construction. Prior to the final acceptance of the Project by the <br />City, the City Engineer shall consult wwith the engineer appointed by District with respect to the <br />work concerned. At completion of t:he Engineering and Construction Phase, the City shall <br />inspect the work and if approved shall issue a letter of acceptance by the City ("Construction <br />Acceptance"). <br />2.5 Ownership, Operatie~n, ;end Maintenance of Project. At final acceptance of the <br />Project by the City in accordance with City Policy ("Final Acceptance"), the District shall convey <br />the Project to the City free and clear of all liens and encumbrances by instrument(s) reasonably <br />acceptable to the City, and City shall/ thereafter own the Project and be solely responsible for the <br />operation and maintenance of the Project. Upon such Final Acceptance, District shall have no <br />