Laserfiche WebLink
Hole by Hole Analysis <br />r,!]; f C;'�Lf <br />Louisville. CO <br />Hole 14 <br />Add fairway bunker with mounds <br />to define the landing area. <br />Bunker: 1,540 sf <br />External tile: 150 If <br />Topsoil: 10 cy <br />Sod: 2,350 sf <br />Remove selective trees, including <br />cottonwood, to improve safety and <br />sightline to the landing area - by owner <br />Add catch basin with draintile to <br />improve drainage. <br />Catch Basin: 1 ea <br />Draintile: 100 If <br />Sod: 2,000 sf <br />Repair 6,231 sf green: <br />Strip sod_ remove silt, <br />add greerrsmlx. regrade <br />and regress <br />RebuiFd t,985srtee: <br />Strip sod, remove silt, regrade tee <br />eurfacer add mofz0ne mix and reseed <br />Rebuild 3,400 sl tee: <br />strip sad, remove silt, regrade tee <br />surfacer add rect:orae mix and reseed <br />TRebuild 3,400 sf lee: <br />Strip soot, remove OIL, regrade tee <br />add rootrone mix and reseed <br />Shorten Fairway to <br />reduce maintenance <br />Repair areas damaged by flooding: <br />Zino sod, remove sit, rude for positive <br />surfaoe drainage. and regress (- 5,000 all <br />Widen fairway to define <br />the landing area <br />Replace cart <br />path to tonne <br />1 <br />J.14 49' 19 <br />Widen cart path at green <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Widen cart path at tees <br />Cart Path: 4' x 50' <br />Curbing: 70 If <br />Construct new 25'x 30' forward tee <br />Repair leakaig overflow pipe <br />Repair areas damaged by flooding. <br />Strip sod, remove sift, regrade for positive <br />eUrfac:e drainage. and regress (- 18,503 sf) <br />[: 210.000 sf] <br />f -line pond and repair overflow sincture <br />Add catch basins with draintile to improve drainage. <br />Catch Basin: 2 ea <br />Draintile: 350 If <br />Sod: 4,500 sf <br />Regrade 27,500 sf of fairway /rough to <br />improve playing surface and drainage <br />Add catch basin with draintile to improve drainage. <br />Catch Basin: 1 ea <br />Draintile: 175 If <br />Sod: 850 sf <br />Rebuild bunker: <br />Remove contaminated sand, reduce size to improve rnainlenanoe, and shift cdaser to <br />the fairway. replace drainage, restore edges, add new sand and regress surrounds. <br />Bunker 1,900 sf <br />Bxternat tile: 125 If <br />Sod: 6,615 sf <br />Rebuild greenslc bunkers: <br />Remove contaminated sand, replace drainage, <br />restore edges, add new sand Arid regras_s <br />summands. <br />E3unker A; 330 sf <br />Etunker el 420 ei <br />External tile: 200 tr <br />Sod: 2,500 sr <br />22 <br />KEY <br />LSlorm Damage Imgro,rei•m: <br />Golf Course Improvement <br />Recommendations <br />Date: January 7, 2014 (Rev 1/14/14) <br />0 100 200 300 FT <br />