Laserfiche WebLink
Golf Course Advisory Board Minutes <br />February 102014 <br />Page 2 of 4 <br /> <br />5. Public comments:None <br />6GCAB Discussion on Reconciliation of Current LU Plan with the budget <br />At the February 4 Council Meeting City Council approvedthe award of aNot-to- <br />Exceed $5M Contract to Landscapes Unlimited for the repair and improvement of <br />the Golf course with an additionalContract in the amount of $150K for “common- <br />sense”improvements to mitigate flood damage. <br />The latest revision to the Hole by Hole Analysis was received from Kevin <br />Norby. Changes between revisions are now expected to be minor to Joe has <br />sent a request to Norby asking that a note of changes be included with each <br />new revision. <br />It is expected that numbers in the LU bid documentwill continue to change as <br />work proceeds. The Board expressed concern that the latest revision has <br />seen a general increase in estimated cost. Joe advised that he expects some <br />items will decrease and some items increase in future revisions <br />LU is waiting for more core samples to determine the amount of work required <br />on the greens. The cost is expected to be less than the additional $250K <br />estimate and should be within the $200K Contractors Contingency. <br />The Board discussed the items listed as “Additional” which are outside the <br />Base Bid. Joe stated that these would be added as Value Engineering of the <br />Base Bid took place and if costunder-runs permitted. These would not be <br />considered as Change Orders to the bid. The Board sees value in adding the <br />Storm Shelter / Restroom and the improvements to the practice facility which <br />are estimated at $217K. <br />The Board expressed concern that some items in the bid were for large <br />amount without supporting detail. Staff advised that payments against the <br />contract would be made based on documented hours and material costs <br />which allayed the Board concerns. <br />Joe willrequest a copy of the Bid Document in Excel form to make it easier <br />for Staff and the Board to analyzethe data and recommend trade-offs. <br />LU is working on a maintenance plan through the grow-in period that will <br />phase-over to maintenance under the control of City Management. Staff will <br />investigate use of LU equipment during this transition period. This will ease <br />cash-flow issues during the start-up. The grow-in period is coveredas part of <br />the LU Base Bid. <br />It was noted that a study is in progress on flood alleviation for Coal Creek <br />upstream of Louisville.This could involve retention ponds between HW 128 <br /> <br />·· <br />Parks and Recreation Department 749 Main Street Louisville, CO 80027 <br />· <br />(303) 335-4735 FAX (303) 335-4738 <br />www.louisvilleco.gov <br />Parks Recreation Senior Services OSpace Forestry Trails <br />Golf <br />3 <br />