Golf Course Advisory Board Minutes <br />April 21 2014 <br />Page 2 of 5 <br /> <br />6 Staff Update <br />a) There has been no update to Landscape Unlimited’s original Microsoft <br />Project document created on Jan 28. The board does not have an <br />electronic copy of the schedule but a quick visual scan shows that most <br />tasks that should be under way or be completed are significantly behind <br />schedule. Joe Stevens stated that, while there were issues, he expected <br />that these could be recovered and the critical date of July to have the <br />irrigation system replaced and functional should still be possible. LU <br />started construction work on April 1. The Board accepted Staff’s comment <br />that the work with FEMA has been much more complex than expected <br />and contractual issues had to be worked at the expense of physical <br />progress. Staff also stated that while FEMA approval is still pending, there <br />were no FEMA issues that prevented work from starting. Staff committed <br />to providing the Board with an updated schedule from LU. <br /> Chris Bradford reported that the following work had been completed: <br />thththth <br />the 14, 15, 16 and 17 greens have been stripped of sod and work <br />th <br />has started on the 18 <br /> 1/3 of the irrigation heads on the last 5 holes have been lifted and <br />placed in storage ready for reinstallation <br /> Due diligence on the irrigation system is under way in order to make a <br />complete request to FEMA for damage compensation. <br /> Trenching for the irrigation system should start on May 15 <br /> Project Worksheets are still under preparation. Replacement of the <br />irrigation system will be covered by a separate worksheet with a view <br />to maximizing the eligibility for reimbursement. <br />The Board expressed concern over the schedule and expects that much <br />progress will be seen by the next meeting. <br />b) Tree work: it is expected that tree removal, pruning and root pruning will <br />be completed in May. This is outside the LU contract and, lacking formal <br />quotes, is expected to cost $15K.Per Chris Bradford , trees have been <br />marked as follows: Pink – dangerous trees marked for removal by Chris <br />Lichty, Red – trees marked for removal by Norby for playability, Green – <br />root pruning needed. Trees behind hole #3 green are being removed, a <br />dangerous tree will be removed behind green #5, trees are being removed <br />to improve sunlight on green #6 and root pruning will be done on trees <br />bordering green #5. Replacement trees will be planted in Fall of 2014/ <br />Spring 2015 The tree plan will be updated by May 5, Norby and Chris <br />Lichty are working on planning and phasing. A community meeting will be <br /> <br />·· <br />Parks and Recreation Department 749 Main Street Louisville, CO 80027 <br />· <br />(303) 335-4735 FAX (303) 335-4738 <br />www.louisvilleco.gov <br />Parks Recreation Senior Services O <br />Golf <br />