Laserfiche WebLink
Louisville Mill Site Redevelopment Project — Preliminary PUD and Plat Submittal Dated 04 103.'14 <br />This Project will require a Preliminary and Final Subdivision Plat, and Preliminary and Final PUD <br />approval for modification of commercial structure(s), construction of new structure(s), parking, and site <br />development. Once the Preliminary Plat is approved and Lot 2 legal description can be described, the <br />application for Landmark Designation of the Grain Elevator would move forward. A Landmark <br />Alteration Certificate /rehabilitation plan will need to be approved by the Historic Preservation <br />Commission, (Planning Commission as par of PUD review), and City Council. <br />Site is within the 100 -yr regulatory flood plain. A Floodplain Development Permit will be required. It is <br />understood that the City of Louisville is currently investigating floodplain mitigation which may affect <br />the 100 -yr floodplain in this area with a CLOMR/LOMR through FEMA. Current design is for the new <br />building on Lot 3 with a FFE above the Flood Protection Elevation, & floodproofing for the basement. <br />Generally, the redevelopment proposed would include the following new and existing building areas, <br />and would provide 65 parking spaces on site to meet the zoning requirements for this district. We <br />intend to seek an extension of the leased railroad ROW for 13 additional parking spaces north of the <br />existing leased ROW as indicated below and on the site plan. We also have the potential to reduce <br />the main floor area of the Mill Site building to provide some tuck -under parking for an additional 5 -6 <br />spaces, depending on tenant requirements for that area. <br />We are seeking approval of an alternate parking plan as indicated for Outlot `A' which would yield an <br />additional 9 spaces. We would like to preserve this flexibility for the future in the event that there are <br />circumstances that would require us to provide this additional parking on site. We have also included <br />13 small car spaces on Lot 3, and 5 small car spaces on Lot 1, using standards that are used in <br />Boulder and elsewhere on the front range. We feel it is appropriate to utilize our land resources <br />prudently, and designing for a percentage of smaller vehicles will conserve land devoted to pavement, <br />reducing heat island effect, and stormwater runoff. <br />PUD Yield From Redevelopment <br />Lot Area <br />Additional RR ROW Area <br />Existing Building Area* <br />Additional Building Area / Lot <br />Total Proposed Usable Building Area 16,500 3,560 <br />Bldg Area Percentage of total 42.24% 9.11% <br />Caranci <br />Lot 1 <br />25,190 <br />5,298 <br />Grain <br />Green Mill Site <br />Lot 2 Outlot A Lot 3 <br />Total <br />9,122 6,841 26,128 67,281 <br />3,576 8,874 <br />proposed <br />10,000 4,094 3,360 17,454 <br />6,500 1,500 15,640 <br />0 19,000 39,060 <br />48.64% 100.00% <br />Net Area ( -1 ksf -util, circ, kit, etc) 0.9 13,950 1,404 17,100 32,454 <br />Parking Required @ 1sp per 500 28 3 34 65 <br />Parking Proposed <br />On Site 19 3 0 34 56 <br />Existing RR ROW 9 9 <br />Potential addl on -site spaces" <br />Potential addl RR ROW"' <br />9 5 14 <br />13 shared /common 13 <br />Notes: <br />" Existing bldg. area of Grain Elevator not all usable /not all counted "proposed usable" <br />* Existing Lot 3 Commercial (former Napa) to be removed, total is all new construction <br />"" 9 net spaces if green space replaced by parking, 5 potential spaces tuck under bldg <br />"a Dependent upon successful negotiation with BNSF for extended lease area <br />Page4of7 <br />