My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 2014 07 01
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
2014 City Council Minutes
>
City Council Minutes 2014 07 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:44:36 PM
Creation date
7/16/2014 9:04:38 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Original Hardcopy Storage
7D4
Supplemental fields
Test
CCMIN 2014 07 01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council <br />Meeting Minutes <br />July 1,2014 <br />Page 5 of 31 <br />• 159 Parking Spaces (2.65 spaces per unit) <br />• Provides the following design attributes: <br />o Street Network enhancements <br />o Articulated, street oriented architecture <br />o Transitions for existing neighborhoods <br />o Public spaces <br />Final Phase 1/1A PUD: Phase 1/1A — Relocated historic structure (commercial Office) <br />• Move 100 year -old structure from 1004 Griffith Street (Historic Preservation <br />Commission recommendation) <br />• Reuse for commercial /office <br />• Waivers are requested on PUD for <br />o Lot width (20', not 40') <br />o Lot Coverage (35 %, not 40 %) <br />o Height (1 story min, not 2 story min.) <br />Final Phase 1/1A PUD: Phase 1 — 55 Townhomes with mews (creates public spaces): <br />• Attached single family units <br />• Under 35 feet in height, complies with MUDDSG for height and transition to <br />existing residential <br />• On -site parking provided in tuck under garage <br />• Visitor parking provided on North Front Street <br />Final Phase 1/1A Public Spaces: <br />• Phase 1 /1A: Detention Basin (Track H), Native seeding and Public Access <br />• Phase 2: Community Garden, Drainage basin and Public Access <br />Final Phase 1/1A Height and Transition <br />• Height: 35'/45': Stories: 2 to 3 requires transition to north (Transition requires <br />no building taller than 35' within 50' from property line) <br />• Block 12: Height — 35', Stories 1 to 3 <br />Access - Traffic: Project is consistent with the plan for Highway 42 (Improvements <br />begin 2015); maintains existing LOS; walkable community concept and two Primary <br />points of access from Griffith Street; Main Street and Highway 42. Cannon Street <br />extension will occur north of E. Lafayette. Alleys will connect from North Front Street to <br />Cannon Street. The remainder of the Cannon Street extension will be in Phase 2. <br />Special Review Use (SRU): <br />• Preliminary PUD requested ground floor residential <br />• MUDDSG permits ground floor residential as a SRU <br />• Purpose for the SRU is to create performance standards <br />• The purpose is to ensure high quality pedestrian environment <br />
The URL can be used to link to this page
Your browser does not support the video tag.