My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Space Advisory Board Agenda and Packet 2014 10 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
OPEN SPACE ADVISORY BOARD
>
2000-2019 Open Space Advisory Board Agendas and Packets
>
2014 Open Space Advisory Board Agendas and Packets
>
Open Space Advisory Board Agenda and Packet 2014 10 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:21:24 AM
Creation date
10/14/2014 9:27:45 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
OSABPKT 2014 10 08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Approach <br />Our project approach illustrates who we expect to <br />accomplish the work and also highlights innovative <br />solutions to achieve the project goals and how we <br />intend to provide value to the City of Louisville. In the <br />interest of simplicity and efficiency, please see our <br />team's resumes in the attachments for examples of <br />similar projects completed by our team. The project <br />schedule (included in `Scope & Cost Form' proposal <br />section) outlines how our project approach fits within <br />the OSAB meeting schedule and January 30, 2015 <br />completion date. <br />1: MEETINGS <br />1.1. Bi- Weekly Progress Meetings <br />Recommendation: Our team will facilitate bi- weekly <br />team meetings utilizing conference call and screen - <br />share technology. Agendas for the weekly meetings <br />will be distributed 2 days in advance of the meeting <br />(for review and adjustment). <br />Deliverables: Bi- weekly meeting agendas, <br />summary meeting notes. <br />1.2. Open Space Advisory Board (OSAB) & <br />Council Meetings <br />Recommendation: We will meet with staff and the <br />OSAB at regular intervals throughout the project, <br />for a total of three (3) meetings. Each of these <br />meetings will be facilitated by the project team, and <br />be structured in an open house format with a brief <br />powerpoint presentation, and interactive displays/ <br />graphics. We will meet with City Council two (2) times <br />during the project - once to share the final signage <br />& wayfinding design palette and preliminary cost <br />estimate, and also at the end of the project to share <br />the final implementation /phasing recommendations. <br />Each City Council meeting will include a powerpoint <br />presentation with supporting graphic materials. <br />Deliverables: Powerpoint presentations and <br />graphic presentation materials for all OSAB <br />and City Council meetings <br />2: SIGNS <br />2.1. Recommended Revisions to Sign Text / <br />Color / Symbols <br />Recommendation: Utilizing signage documentation <br />provided by the City of Louisville, our team will <br />catalogue the text /colors /symbols of the existing <br />project area signage, and evaluate them against <br />established `best practice' examples of how to <br />effectively and compellingly communicate information <br />through signage. Based on this evaluation, we will <br />make recommendations for revisions that help improve <br />the sign text /colors /symbols. <br />Deliverables: Summary of `Best Practice' <br />precedents, recommendations for revisions to <br />sign text/colors /symbols. <br />2.2. Three (3) Concept Options for the Sign <br />Package <br />Recommendation: Based on the recommendations <br />established in step 2.1, we will create three (3) <br />preliminary signage and wayfinding design palettes <br />for the project area. Each palette will contain a <br />representative variety of sign types and scales, <br />communicating a comprehensive overview of how <br />each option will look, feel and function. <br />The three concept options will be presented to staff <br />& the OSAB for review and comment, and we will <br />summarize the direction for the final signage palette <br />based on feedback received, and utilize this feedback <br />to create a final signage & wayfinding sign package. <br />The final package will include details for each sign <br />type, cost estimates for each sign type, construction <br />documentation drawings for each sign type and three <br />material and color boards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.