Notes from golf course tour October 8, 2014 <br />GCAB Members Present: Ken Gambon, Lisa Norgard, Dennis Maloney, Tom Deany, Perry <br />Nelson, Sandy Stewart <br />GCAB Members Absent: Heikke Nielsen. <br />Council Member: Ashley Stoltzmann, Hank Dalton, Susan Loo <br />City Staff: Malcolm Fleming Joe Stevens, Allan Gill, David Dean <br />Landscapes Unlimited Staff: Jeff Matthews, Chris Lewis (Broadlands GC Superintendent and <br />Agronomist) <br />Members of Public: Kevin Norby (Golf Course Architect,) John Leary, Earl Hauserman <br />Summary <br />Jeff Matthews gave the following summary on schedule <br />• Landscapes Unlimited remain committed to a Spring 2015 opening date (June 21 or earlier) <br />despite several tasks being behind schedule. <br />• All greens are seeded except for holes 1 and 2. Hole 1 will be seeded tomorrow and hole 2 <br />green is ready for top soil and will be seeded next week. Greens on holes 4, 5, 7, 11, 14, 15, <br />16, 17 and 18 are already being mowed. Holes 6, 8 and 12 will have their first mowing next <br />week. <br />• Green covers were due today and will be deployed when frost is forecast. They will be <br />removed twice weekly for mowing while the new grass is still growing. <br />• All tee boxes are complete except for holes 1 and 2. Tee boxes on hole 12 have been ready <br />for seeding for some time but they are adjacent to the main access point for heavy vehicles. <br />These boxes will be seeded within 10 days once that access is no longer an issue. <br />• Many bunkers are complete and some are waiting for sand fill. This can be done at a later <br />date as it is weather independent and priority is being given to seeding and sod - laying <br />operations. <br />• Shaping the berm adjacent to HWY36 is on hold as the large bulldozer is being used to finish <br />green shaping and the smaller bulldozer suffered a mechanical failure. It is expected that the <br />drip irrigation will be completed on the berm and trees planted in the next three weeks. <br />• Fabrication is proceeding on the three new bridges with delivery expected in three weeks. <br />These will be prefabricated and a large crane is needed to position the 80 ton bridges. <br />Access to the hole 6 bridge will prove a challenge and multiple repositioning and lifts by the <br />crane is needed to avoid damage to cart paths etc. <br />• The laser- equipped tractor was vandalized by putting contaminant in the fuel tank. The <br />engine may be significantly damaged. So far, vandalism has been minor, other than this <br />incident. <br />• The warm wet weather recently has proved ideal for growth and the newly seeded greens and <br />fairways are germinating well. <br />• Joe Stevens estimates that the project is 85% complete based on progress and payments <br />authorized to LU. <br />Golf Course Tour Notes: October 8 2014 Page 1 <br />9 <br />