My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-2005 December-January
PORTAL
>
COMMUNITY UPDATE NEWSLETTER
>
2004 Community Update Newsletter
>
2004-2005 December-January
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 11:47:29 AM
Creation date
11/4/2014 11:54:19 AM
Metadata
Fields
Template:
CITYWIDE
Doc Type
Newsletter
Record Series Code
40.260
Record Series Name
Publications
Quality Check
1/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RECENT CITY COUNCIL ACTIONS NEW COMMUNITY PARK <br /> e following is a list of action items that the City Council has UPDATE <br /> taken since the last edition of the Community Update. <br /> q> Approved a request from the Boulder Valley School e Community Park is starting to take <br /> District for the use of School Improvement Fee Monies to shape. The design and construction <br /> provide outdoor lunch tables and seating for Monarch High drawings are 75% complete. The theme is <br /> School. "The Crossroads of Nature, <br /> Approved Ordinance No. 1455, Series 2004, allowing History, and Community" and <br /> new zoning and development on the St. Louis Parish parcel at it blends together Louisville's w . <br /> Dillon Road and 96th Street. rich small town culture and its <br /> - <br /> Approved Resolution No. 43, Series 2004, ratifying an heritage. <br /> intergovernmental agreement for improvements to the After holding public meet- <br /> McCaslin Boulevard/US 36 interchange between the City and ings to help determine the <br /> the Town of Superior. right look and blend of uses <br /> Authorized an agreement with the Colorado Group, Inc. for the park, the our consultant Design Con- <br /> for real estate broker services for the sale of the current cepts went to work with Land Management <br /> Library Building. staff and the City Council to determine the <br /> q> Awarded a contract to McMenamin Design Associates best use of all 16 acres. <br /> for an update of the City Hall Space Needs Analysis. Park construction should begin in February <br /> Approved Resolution No. 46, Series 2004, entering the 2005, weather permitting. Park construction <br /> City into an intergovernmental agreement for membership in should be complete by mid-summer 2005. <br /> the Greater Metro Telecommunications Consortium. After construction dust settles, and the turf <br /> Adopted a "Statement of Policies and Procedures Re- areas become established, the park will be <br /> garding City Council Meetings and Study Sessions; the Public ready for public use. For further information, <br /> Availability of City Council Agendas, Meeting Minutes, and please contact Kathy Kron, Parks Project <br /> Other Documents; and the Cost of Public Records. Manager, at 303.335.4736. <br /> MCCASLIN INTERCHANGE UPDATE HIGHWAY 42/96TH STREET <br /> improvements of the McCaslin Boulevard Bridge CONNECTION UPDATE <br /> I nterim <br /> are now complete. The improvements included the <br /> significant amount of work is now <br /> removal of the existing concrete median, miscellaneous asphalt complete on the South 96th Street/ <br /> repairs on the bridge deck, the removal of some curb and gutter State Highway 42 Bypass Project. Work contin- <br /> and medians on McCaslin Boulevard, and related work. This ues on both the bridge crossing Coal Creek and <br /> allows for four through lanes, two in each direction, and one ..� the bridge over the Burlington <br /> left turn lane in each direction. 1 `�. ] , <br /> Larger improvements to the interchange will begin in early <br /> Northern Santa Fe railroad <br /> 2005 with construction anticipated to be complete by October. tracks. <br /> The contractor continues <br /> The full improvements will add a loop in the southwest quad- <br /> rant of the interchange for southbound traffic to have access to to concentrate on asphalt paving work. If the <br /> US 36 eastbound to Denver without having to make a left turn. weather cooperates, the bypass section of the <br /> In addition, the park-n-Ride will be improved and relocated and roadway could be opened in December with <br /> a pedestrian bridge will also be erected to ensure a safe crossing <br /> work complete in February 2005. <br /> We appreciate your patience during this <br /> for pedestrians over US 36. <br /> project. If you have any questions, please <br /> For additional information about the project, please contact contact the Public Works Department at <br /> Heather Balser at 303.335.4530. <br /> 303.335.4608. <br /> December 2004 - January 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.