My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 1 February-March
PORTAL
>
COMMUNITY UPDATE NEWSLETTER
>
2004 Community Update Newsletter
>
2004 1 February-March
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2018 11:47:29 AM
Creation date
11/4/2014 2:28:39 PM
Metadata
Fields
Template:
CITYWIDE
Doc Type
Newsletter
Record Series Code
40.260
Record Series Name
Publications
Quality Check
1/25/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NOTES FROM THE CONCRETE REPLACEMENT REQUESTS <br /> PLANNING BEING ACCEPTED <br /> DEPARTMENT e Public Works Department is currently conducting a concrete <br /> 1 improvement survey within the public rights-of-way to determine <br /> e Louisville Planning potential replacement items for the 2004 Concrete Replacement Project. <br /> Department includes two Curbing and/or sidewalks that exhibit signs of settlement greater than <br /> primary divisions:Building Safety 3/4-inch and pose a safety hazard, or that exhibit excessive cracking <br /> and Community Planning.The and fragmentation shall be included in the program replacement list. <br /> Building Safety Division is Inspected concrete sections shall be prioritized on the basis of condition <br /> primarily involved in reviewing and safety hazard. Due to budget limitations, only a portion of the overall <br /> and approving all plans for replacement list will be included in this year's contract. Concrete within <br /> building construction in the City, driveways will not be replaced as part of this program. <br /> including the inspection of all If you know of concrete sections within public rights-of-way, which <br /> appear to exhibit the conditions described above, please notify the Public <br /> construction work.The Planning Works Department at 303.335.4608 by February 13. Requests for concrete <br /> Division processes public hearing replacement after February 13 will be inspected for the 2005 concrete <br /> applications for new development replacement program. Please call the Public Works Department with any <br /> and also manages long range questions. <br /> planning projects for the City, COMMUNITY redevelopment projects. COMMUNITY PARK UPDATE <br /> Several redevelopment Work continues on the new Community Park to be developed off <br /> projects have been reviewed at of Bella Vista Drive at Roosevelt Avenue. City Staff and our <br /> public hearings in the past year, consultant, Design Concepts, held a second public <br /> including the Highway 42 meeting on January 14 to take input from residents <br /> Revitalization Area Master Plan on what they would like to see in the final design <br /> and the proposed Storage Tek of the park. A third public meeting on the design <br /> Zik ' <br /> Site Redevelopment Plans.If progress will be scheduled for the latter part of a <br /> you are interested in knowing February. rat <br /> about these or other projects and Once a design is complete, it will be submitted <br /> their public hearing dates,please to the Planning Commission for review. This is <br /> visit the Planning Department tentatively scheduled for May. Following that, the <br /> page on the City's web site at plan will go to the City Council for its approval. <br /> Staff hopes to bid the project this summer and <br /> wwwci.louisville.co.us/ begin construction in the fall. Construction of the park will take place in a <br /> planning.htm and click on the phased approach over two years. <br /> "Development Proposals Under Progress is also being made on the design of the Bella Vista connector <br /> Review"icon. street. Staff plans to select a street design consultant in February and then <br /> have a public meeting in March or April to review the proposed design <br /> work. We believe that the combined design efforts on the community park <br /> DEVELPMEN and the street are critical to providing a seamless, cost effective approach <br /> R to the overall improvement of this site. <br /> UNDER REVI In addition, the City plans to apply for a Great Outdoors Colorado grant <br /> IITHIN rimPINn to help offset some of the costs of the park project. <br /> At 1 If you have any questions or comments on these projects, please <br /> contact the Land Management office at 303.335.4736. <br /> February/March 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.