My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Study Session Summary 2014 10 28
PORTAL
>
CITY COUNCIL RECORDS
>
STUDY SESSIONS (45.010)
>
2010-2019 City Council Study Sessions
>
2014 City Council Study Sessions
>
City Council Study Session Summary 2014 10 28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 11:52:26 AM
Creation date
12/3/2014 3:27:15 PM
Metadata
Fields
Template:
CITYWIDE
Supplemental fields
Test
SSSUM 2014 10 28
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council <br />Study Session Summary <br />October 28, 2014 <br />Page 3 of 3 <br /> <br />like to get this project underway in 2015. Offsite detention for the Core Area will <br />be behind solids handling area. <br /> <br />If Council wants properties out of the flood plain, 40 50 trapezoidal swales will <br />be created to convey the water without flooding other properties. <br /> <br />Update/Discussion Louisville/Superior Joint Utilities Operations <br />Louisville staff, Superior staff and the consulting firm Dewberry Engineers have <br />explored the feasibility of cost savings through consolidation of two independent <br />municipal water and wastewater systems. <br />water interconnect and $18 million in Wastewater Treatment Facility <br />capacity at the Water Treatment Plant. The Wastewater Treatment Plant needs <br />$26.1 million in upgrades to meet Compliance Schedule and Regulation 85. <br /> <br />Integration will optimize the use of existing facilities for both municipalities and <br />reduce capital expenditures. <br /> <br />Alternative scenarios presented in the packet were discussed. It would be timely <br />to get necessary pipe in the ground during US36 construction. Council <br />suggested the Water Committee follow up on these issues. <br /> <br /> <br /> <br />City Manager Fleming discussed the Advanced Agenda. <br /> <br />Future Discussion items: <br /> <br /> <br />Adjourn 9:18 pm <br />Submitted by Dawn Burgess <br />October 29, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.