Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />February 12, 2015 <br />Page 4 of 12 <br />• SRU — Staff requesting ground floor residential uses along portions of Cannon to <br />encourage pedestrian interaction, Staff asked for additional treatments such as opening, <br />doors, and architectural bump -outs and variations. <br />• Waivers — <br />Waiver Requirement <br />Street sections Suburban <br />Min. Building Height 2 Stories /35' <br />Request Location <br />Shared Spaces /walkable Phase 2 <br />1 Story/16' <br />Building D, Block 13 <br />Min. Rear Setback — 20' 0' Phase 2 <br />Accessory Structures <br />Indoor Eating & Drinking Gross Floor Area: Gross Floor Area: Phase 2 <br />Establishments 5,000 SF 6,000 SF <br />Signs -No roof mounted -Roof mounted - Building D, Block 13 <br />No monument - Monument -Block 14 <br />signs in MU -R in MU -R <br />• Staff recommends approval of the requested finatat, final PU 1, SRU for Phase 2 <br />of the development called DELO. The proposal will allow for the de ° opment of a mixed <br />use project in the Highway 42 Revitalization Area. Staff has determined the waivers are <br />appropriate under LMC Section 17.14.090 and 17.28.120 to allow for an effective <br />development given the location and surrounding land uses. <br />• Staff recommends the following conditions of approval: <br />o 1. The applicant shall continue to work with the City on the specifics of the <br />maintenance of open space and roadways. Final details will be included in the <br />submittal packet prior to City Council. <br />o 2. If an offsite solution cannot be found, staff requires the detention basin and <br />public gathering space, as depicted in DELO Phase 1 and 1A, be located in <br />Outlot B, Outlot C and within the E. Lafayette Street right of way. The basin <br />should be designed to provide stairs, stepping down from Cannon Street through <br />the proposed retaining walls, to make this space more publically interactive. The <br />stairs should be a minimum width of 50 feet along Canon Street, or a mutually <br />support design alternative that is open and accessible. <br />o 3. Should a regional offsite detention basin be created to detain the drainage of <br />the Highway 42 development (including DELO Phase 1/1A and Phase 2), staff <br />requires the applicant reinstate the plans for Nawatny Greenway as depicted in <br />DELO Phase 2 PUD. <br />o 4. The City and applicant shall address the comments listed in the Public Works <br />memo dated February 5, 2015 prior to City Council. <br />Commission Questions of Staff.' <br />Moline asks about Building D and waivers. Where will the monument sign be located? <br />McCartney says Building D is the southern -most building on South Street, intersection of <br />Cannon and South. The monument sign will be located at Building E. <br />Moline asks how do you move or change some of the uses in the future if warranted? Is the <br />PUD revisited to convert some commercial to residential or to move commercial or office into <br />something that was previously residential? <br />McCartney answers if there is an impact on parking and additional parking elements. <br />Otherwise, use is permitted by right. PUD does not establish the uses; it establishes the <br />development. If they are asking to reduce the retail and allow for residential, then an SRU is <br />necessary. <br />Rice asks about McClure's letter submittal. He states that there are 135 residential units in <br />Phase 2 and approximately 31,000 SF of commercial /office. McClure's letter speaks in terms of <br />113 residential units and 26,000 SF of commercial. <br />