Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />April 9, 2015 <br />Page 4 of 27 <br />• Turn of the century Louisville was agrarian and industrial with ACME mine. <br />Proposed PUD site plan: <br />• Create open space in front of Grain Elevator to be used as park with picnic tables. <br />• Wants to bring Downtown streetscape to Front Street in front of building, transition from <br />attached sidewalk to detached sidewalk. <br />• Bring Downtown street lighting to create node at Elm Street (northwest corner) for a <br />crosswalk for safe pedestrian crossing. Applicant does not feel there is enough traffic <br />calming in the area for cars at higher speeds. Applicant wishes to work with the City and <br />LRC regarding lighting. <br />• As part of the purchase agreement, the applicant has negotiated a conservation <br />easement to be placed on Outlot A as a "no- build" zone. Ap. -nt does not want <br />buildings placed in front of the Grain Elevator. <br />• RCC Inc. has current lease with BVSD for parking whic •e continued as well as <br />extending the lease to pick up 13 spaces. They are ly counted in the <br />calculations. <br />• Site designed to preserve views to Grain Eleva <br />utility easements to Lot 2 and Outlot which e <br />• Applicant in contact with Warembourg fa <br />to the property. They would be installed <br />at the Warembourg farm. <br />• In addition, there is a small granary existing <br />to relocate the small granary ne the large Gr <br />height at peak and floor is 14 - . When full, <br />Grain Elevator held over 20,00 <br />• Applicant discusses third story a <br />explored which would mean expa <br />t "no -buil • e and access to <br />s the "no -build <br />arding donation of h <br />o the porte ochere. The <br />scales back <br />ently exist <br />bourg farm. Applicant wishes <br />ator and restore it. It is 11.5 feet <br />II granary held up to 900 bushels; <br />5 fe <br />the <br />r <br />shed of the Grain <br />spread out, and <br />average grad <br />required b <br />plain. <br />• Architectural co <br />co <br />It is sup <br />et over <br />ots alo <br />issue. B <br />t limit. o story development was <br />impede into the view <br />ings more compact, less <br />itrary hei. limit. Height is measured from <br />e street and property rises to patio in front, <br />g needed to be pushed out of the flood <br />e has lo <br />e of flood p <br />enefi <br />an history of Louisville as well as provide <br />City. The levator inside contains a six -pack of grain <br />ructure, extending below grade to upper area, measuring 45 <br />mension. The applicant wants to preserve them and upper <br />c site. Proposed plan includes a stairway to upper <br />so n warehouse and the office area are usable space. To <br />applicant wants to construct an eastern addition for restrooms, <br />areas as well as a western addition. The eastern addition will <br />railcar since this is where one would historically be located. <br />s proposal. <br />tall and 1 <br />ea as an interp <br />alk for viewing. <br />t these areas <br />en, and ut <br />d like a <br />r <br />c <br />sma <br />be <br />fee <br />ive <br />e <br />fas <br />• HPC has <br />• Applicant ag <br />much larger an <br />th the conditions from Staff. Applicant has made the porch at Lot 1 <br />rought siding onto the building as backdrop for signage. Different earth <br />tone colors will be used. Applicant is okay with loss of monument sign; at each entry <br />points to the development, post mounted signs in full compliance are acceptable. The <br />hours of operation are agreeable. <br />• Applicant discusses items with Public Works regarding flood plain mitigation to storm, <br />sanitary, and sewer. <br />• Applicant states that all overhead utility lines on and off the site would be underground. <br />All utilities will be underground on site, but utility lines near the site are too expensive to <br />address. Applicant wants Condition that they are not required to do this. <br />