Laserfiche WebLink
Louisville Fire Department Comprehensive Plan Implementation <br /> 1008 2009 2010 2011 <br /> Comp Plan <br />iD Task Name Start Finish Duration Status <br /> Objective q7 01 03 Q4 07 02 03 04 Of 02 03 04 O7 <br /> <br /> Property 10/312006 12/3112010 1370d <br /> Rebuild Station # 1 in the current <br /> location resulting in a building which Funded to conduct a feasibility study of existing <br />12 1/7/2008 12/31/2010 780d Should result in sketch drawin <br />s in 2008 <br />facilit <br /> is up-to-date with respect to current g <br />. <br />y. <br /> Building Codes. <br /> A third fire station should be <br /> constructed in the southeast part of <br /> the district to decrease response Initial evaluation complete. Looking at all available <br />13 times for the high risk occupancies in 6/G/2006 6/6Y2006 1d options, including utilizing a combined station with <br /> the area and to support the City of NMFPD (on 96th St across from Sun property). <br /> Louisville's planned commercial and <br /> residential growth. <br /> Upgrade the existing learning <br /> rcntcr at C}atinn #1 I <br />Intil a_ <br />' <br /> _ <br />facility can be constructed the <br />new <br />1a existing facility must have the 10/3/2005 1/1/2007 326d Complete. <br /> necessary tables, chairs & AV <br /> equipment to meet the department's <br /> continuing education requirements. <br /> Evaluate the feasibility of <br /> constructing a small training facility County option was not considered. Working with city <br />15 within District boundaries. Also 1/7/2008 12/31/2010 780d to donate land at S. 104th St and Cherry St. for new <br /> evaluate the possibility of locating a training center. <br /> county training facility in the district. <br />