My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Committee Agenda and Packet 2015 04 03
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
UTILITY COMMITTEE (pka: Water Committee)
>
2006-2019 Water Committee Agendas and Packets
>
2015 Water Committee Agendas and Packets
>
Water Committee Agenda and Packet 2015 04 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 10:46:51 AM
Creation date
7/17/2015 12:30:02 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
WCPKT 2015 04 03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 WATER DEMAND AND HISTORICAL DEMAND MANAGEMENT <br />Peak demand occurred in July 2013 at 0.715 mgd. Average production from the plant during warmer months <br />from May through September is approximately 0.55 mgd. Total annual production from the plant in 2013 <br />was approximately 100 MG <br />The City supports maximizing reusable system utilization and the potential exists to increase the supply of <br />reuse water. Several water users have expressed interest in switching to reuse in place of potable water for <br />their irrigation needs. During 2014, the City conducted a study evaluating reuse system expansion. It was <br />found that with the current water rights usage, there is very little spare capacity in the reuse system <br />because the City has a limited amount of reusable water. As a result of that study, Louisville decided to <br />maximize utilization of the system by installing infrastructure that would enable several large users to <br />transition from potable water to reuse supply. This transition is expected to occur within the next five years <br />and is estimated to reduce Louisville's peak demand by 130,000 gpd, and seasonal demand by <br />approximately 12 MG. More reusable water will become available as Windy Gap water starts to get used in <br />the municipal system, which will be done once the Windy Gap Firming Project is completed. Currently, the <br />Windy Gap supply is not utilized because of its unreliability and high cost. Several City parks still use potable <br />water for irrigation, totaling about 66 MG per season. Expanding the reuse system to include additional <br />large water users and City parks could increase the total reuse water used annually to approximately <br />120 MG. Over a period of 6 months, this would be equivalent to approximately 0.66 mgd. <br />2.3 Current Demand Management Activities <br />The City of Louisville is very committed to efficient water use and good environmental stewardship. The <br />activities and programs described in this section were implemented by the City prior to 2014 and water <br />savings have already been achieved from these efforts. A summary of water conservation activities is also <br />provided later in the plan in Table 14, which also has a list of existing activities. <br />2.3.1 Foundational Activities <br />2.3.1.1 Water Conservation and Integrated Resources Planning <br />• The City implements an integrated resources planning approach that fully integrates water conservation <br />into water supply planning processes. <br />• The City regularly updates their water supply master plan, capital improvement plan, and feasibility <br />studies to ensure a diverse, robust, and resilient water supply. <br />2.3.1.2 Metering, Water Rates, and Billing Practices <br />• 100 percent of the City's customers are metered. <br />• Water use is tracked by various customer categories (residential, multifamily, commercial, irrigation, <br />and city). <br />• There is monthly volumetric billing for all customers. <br />• Drive -by advanced metering infrastructure (AMI) with new meters were installed in 2010 -2011. <br />• The City has a goal to replace meters every 10 years. <br />• Water rates are reviewed annually and adjustments are made to cover utility costs. <br />• There is an inclining block water rate structure to encourage efficient outdoor water use and other <br />conservation - oriented structures are being considered. <br />• Commercial water tap fees are charged based on estimated annual demand, which could result in more <br />water - efficient development. <br />• Separate irrigation meters are required for townhomes and multifamily developments with 5 or more <br />units and are offered for commercial as optional. <br />2 -10 WBG071714052946BSO <br />
The URL can be used to link to this page
Your browser does not support the video tag.