Laserfiche WebLink
the process, the consultant has identified several alternatives, as <br />far as routings. He stated that within the next two (2) weeks he <br />will have a draft on it. The draft Louisville will have is a <br />chance to review at a staff level and give the response back to the <br />consultant. There should be a final report for Council's <br />consideration in approximately 1 1/2 months and Council can select <br />the alternative that is best for Louisville. <br /> <br />Mayer: <br /> <br />In looking at the 1980 Master Plan I <br />was wondering, if you had any <br />preliminary ideas what the new <br />Master Plan might look like. <br /> <br />Urbonos explained that it will look very similar to what is shown <br />(pointing to an illustration). The alignments may change from what <br />was shown in the 1980 Master Plan. For instance, one of the <br />alignments east of the Treatment Plant to Coal Creek would be <br />joined by the Drainage Way 8 coming from the north, from the new <br />commercial development that was recently built, and connect into <br />it.. The other alignment they're looking at is east of the <br />Treatment Plant going to the northeast first and, then, coming <br />across to the northeast first, then back down along the original <br />Drainage Way 7 route just west of Lafayette. He stated that <br />primarily those are the two (2) primary alignments, with some small <br />variations as they approach the conclusion of what's best to <br />recommend to Council. There is one additional drainage, the <br />tributary drainage way . <br /> <br />Mayer: <br /> <br />Urbonos: <br /> <br />What about the tributary? <br /> <br />That's was not shown on the original <br />Master Plan. We're adding it, <br />because there is new development <br />that was an oversight at that time. <br />There is some new development <br />occurring that we're looking at with <br />greater detail than we did at that <br />time. There is definite need for <br />another drainage way to connect to <br />the creek. <br /> <br />Mayer: <br /> <br />If we have to give instructions to <br />the Mayor in terms of drainage here, <br />would we be able to do that? <br /> <br />Phare: <br /> <br />Without knowing the specific <br />alignments, which won't happen until <br />the revised Master Plan is adopted <br />and approved, the only thing I could <br />think of would be to agree, in <br />general concept, where those <br />easements or route may be and allot <br /> <br />10 <br /> <br /> <br />