My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2015 11 02
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2015 City Council Agendas and Packets
>
City Council Agenda and Packet 2015 11 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2022 10:48:27 AM
Creation date
11/9/2015 8:45:11 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7A6
Record Series Code
45.010
Supplemental fields
Test
CCAGPKT 2015 11 02
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
KDG Engineering LLC <br />3B. OTHER DIRECT COSTS (OUTSIDE): <br />ITEM <br />Per Diem ..,., <br />MIJease <br />ESTIMATED UNITS <br />DESIGN CONSTRUC- <br />LlNl7 RATES <br />50.000 <br />Ogler , <br />50.00 <br />SUBTOTAL <br />KOG ENGINEERING: SUBTOTAL (SLUM 1Rl+2 3A *3 <br />Fria? Approval from cDoT Project Manager mooed <br />5. FEE PROPOSAL <br />DESIGN & CONSTRUCTION <br />ESTIMATED COST <br />TOTAL <br />DESIGN <br />CONSTRUC. <br />50.00 <br />50.00 <br />MOD <br />$0.00 <br />SLI,GO <br />MOO <br />50.00 <br />50.00 <br />$0 0.0 <br />555,697.00 <br />$0.00 <br />$OEOD <br />555,697.00 <br />50.00 <br />S D.00 <br />_ <br />$D:Dd <br />50.00 <br />- <br />50.00 <br />saw <br />silo') <br />560J70.50 $Ii0,4Z1.l.0 <br />$141,19230 <br />4A. OUTSIDE SERVIES RATES (SUBCO?ISUL'rANTS) <br />PIR►M NAME <br />Harris Kotler Smith Roadway & Hydraulles <br />Harris Kocher Smith Survey & ROW <br />Pinyon Env1rorrmeriraI <br />Yeti & Associates <br />SUBTOTAL <br />4R. OUTSIDE SERVICES (VENDORS): <br />FIRM NAME <br />NONE <br />NOW <br />• Prior Approval from CUOX ProJect Mannar requiTed <br />TOTAL OUTSIDE SERVICES <br />TOTAL ESTIMATED COST <br />!Sum of 19 +2 +3A +3B+4A.ABM <br />ESTIMATED COST <br />oCIGN <br />1 CONSTRUC, <br />TOTAL <br />Sii ,575.07 <br />50.00 <br />5205.939.04 <br />533,100.00 <br />$0.00 <br />$25,567 .Du <br />50.00 <br />30.00 <br />$18,000.00 <br />555,697.00 <br />5150424100 <br />555,697.00 <br />5205.93940 <br />ESTIMATED COST <br />DESIGN <br />C0f+ISTRUC. <br />TOTAL <br />50-00 <br />$0 -00 <br />5205.939.04 <br />$0.00 <br />$0 -00 <br />50.00 <br />S0 -00 <br />30.00 <br />DESIGN <br />CONSTRUC. <br />TOTAL <br />510242.00 <br />555,697.00 <br />5205.939.04 <br />DESIGN <br />CONSTI L C. <br />TOTAL <br />S211,012.50 <br />$136.118, <br />$3,17.131.30 <br />I DECLARE THAT TO THE BEST OF MY KNOWLEI ETHE WA5E RATES AND OTHER. FACTUAL UNIT <br />RATES SUPPORTING THE COMPENSATION TO BE PAID BY THE DEPARTMENT FOR THE PROFESSIONAL <br />SERVICES ON THIS DOCUMENT ARE ACCURATE, COMPLETE AND CURRENT AT THE TIME OF <br />CONTRACTING, AND INCLUDE NO UNALLOWABLE OR DUPLICATE COSTS. <br />Steoley H. Kobayashi <br />(TYPED NAME <br />(SIGNATURE <br />/71 <br />(RATE SIGNED) <br />pag50 e 2 ar 2 Revised January 2201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.