My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2015 11 02
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2015 City Council Agendas and Packets
>
City Council Agenda and Packet 2015 11 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2022 10:48:27 AM
Creation date
11/9/2015 8:45:11 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7A6
Record Series Code
45.010
Supplemental fields
Test
CCAGPKT 2015 11 02
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Joliette Woodson, PE <br />October 9, 2015 <br />Page 2 <br />ii. Peak Hour Count Data. Turning movement count data will be collected <br />during the morning, noon, and evening peak periods. <br />b. Crash Data. Crash data will be provided by CDOT. <br />c. Signal Warrant Study. A signal warranty study will be prepared for warrants 1, 2, <br />3, and 7. <br />d. Report. STS will prepare a letter report summarizing the analysis, conclusions, <br />and recommendations. <br />If the City would like to have any of the warrants evaluated that have been excluded, a <br />fee can be developed to evaluate them. <br />4. Management of the Signal Construction. STS will assist the City with the <br />management of the signal construction. The following tasks are anticipated: <br />a. Review submittals <br />b. Site visits — 8 <br />c. Review pay applications — 3 <br />d. Develop signal timing <br />e. Prepare as -built plans for the signal <br />f. Telephone consultation with the contractor - 2 <br />Schedule <br />STS will accommodate the schedule established by KDG Engineering and the City. <br />Estimated Fee <br />The work described in the proposal will be invoiced on a time and materials basis at an amount <br />not to exceed 10,694.00. The table attached to the letter shows the hours and expenses <br />assumed in the fee estimate. <br />We look forward to working with you on this project. Please contact Joe at 303.589.6875 or at <br />joe@ sustainabletrafficsolutions.com with questions. <br />Sincerely, <br />SUSTAINABLE TRAFFIC SOLUTIONS, INC. <br />Julia B. Henderson <br />President <br />SH 42 -Short Street Traffic Engineering Assistance Proposal <br />Joseph L. Henderson, PE, PTOE <br />Project Manager / Principal <br />57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.