City Council Water Committee <br />Meeting Minutes <br />Friday, July 10, 2015 <br />Page 2of6 <br />Staff attended a Windy Gap Participants' Committee Meeting on July 7t" <br />A revised budget estimate was presented with a more formal estimate <br />anticipated in the next couple of weeks. NCWCD is planning on soliciting <br />for a design consultant later in the year with work expected to start in <br />2016. <br />• Gross Reservoir Update <br />Mr. Flack reiterated Denver Water's plans to expand the capacity of <br />Gross Reservoir. As part of the environmental approval process, Denver <br />Water was required to create an environmental pool, which is an amount <br />of water that is stored in Gross and is released to South Boulder Creek to <br />promote aquatic life. Denver Water has an existing agreement with <br />Lafayette for the filling and use of this environmental pool. We have been <br />engaged in discussions with Lafayette on a possible spilt of this space to <br />expand the reliability of our water supply. Recent conversations have <br />moved away from this concept of splitting space and now center around a <br />trade of supplies. Staff will continue to evaluate the options available and <br />provide an update as progress is made. As mentioned before, Gross <br />Reservoir could become a realistic opportunity to increase Louisville's <br />local basin water storage under the correct terms and conditions. <br />VII. Update — CIP Projects (Cory Peterson /Kurt Kowar) <br />• Wastewater Treatment Plant Upgrades <br />i. Status: Under construction (contractor: MHW) <br />ii. Contract Cost: $31.2 million. <br />iii. Estimated completion: July 2017 <br />Mr. Peterson mentioned that MHW has started the excavation <br />portion of project which will consist of the majority of activity onsite <br />for the next several weeks. Mr. Kowar discussed the recent <br />incident of above average inflows to the plant theorized as a result <br />of the high groundwater attributable to heavy precipitation over the <br />last couple of months. Staff is assessing the situation to <br />determine if this a short term issue that will be alleviated as <br />groundwater levels return to normal or if further measures such as <br />improvements to the collection system or modification to the plant <br />rating are required. <br />• Louisville /Lafayette Drainageway Improvements <br />i. Status: final design, construction bid advertisement dependent on <br />permitting. <br />ii. Engineer's estimate: $9 million total cost before UDFCD & City of <br />Lafayette contributions. <br />Mr. Fleming spoke to a Right -of- Way(ROW) issue on Spruce that <br />was included as part of the unsuccessful Lee Street Connection <br />deal. The property owner is awaiting council action on the <br />Highway 42 Plan prior to providing the ROW to the City. Mr. <br />