My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2016 01 26 SP
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2016 City Council Agendas and Packets
>
City Council Agenda and Packet 2016 01 26 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:23 PM
Creation date
1/27/2016 2:38:44 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7A6
Record Series Code
45.010
Supplemental fields
Test
CCAGPKT 2016 01 26 SP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Louisville Adopted Programs, Sub- Programs, Key Indicators and 2016 Contributing Projects <br />(Red indicates items proposed for addition since the 11/2/2015 adoption of the Budget or additional emphasis Council wants a project to have; may require additional resources) <br />Programs <br />Sub- Programs <br />Key Indicators <br />2016 Contributing Projects <br />Transportation <br />Planning and Engineering <br />Accessbility and mobility index, Mode <br />split, % of trip types: regional /local <br />Accident rates; compliance with OCI <br />and per capita cost policy objectives; <br />measured satisfaction levels; streets, <br />trails plowed and public buildings <br />shoveled within XX hours. <br />1. Complete South Street Gateway Underpass (dependent on RR) <br />2. Complete Hwy 42 Plan Short Street improvements <br />3. Complete DDI <br />4. Complete County Road Bridge <br />Transportation Infrastructure Maintenance <br />1. N. McCaslin resurfaced <br />2.2016 downtown booster complete <br />3. Lucity Asset Management Software, ERP and Cartegraph permit modules fully operational <br />4. Expanded paving- streets /gutter /sidewalks /utilities <br />Streetscapes <br />Complete Phase II downtown brickwork resetting <br />Snow &Ice Removal <br />1. Improved snow removal with with computer controls, storage and ice slicer. 2 <br />Clear streets at sidewalk corners <br />Utilities <br />Water <br />Compliance with all regulations; Minimal <br />complaints; Competitive prices; <br />Effective conservation of resources; <br />Measured satisfaction levels. <br />1. Finish major renovations (Pump Station, Chlorine Contact Tank) to SCWTP <br />2. Evalaute Water Financial Plan <br />Wastewater <br />Substaial completion of WWTP <br />Stormwater <br />Complete Citywide Drainage Asset Management Plan <br />Solid Waste, Recycling and Composting <br />Implement Admin Fee adjustment to provide sufficient working reserve funds. <br />Public Safety & <br />Justice <br />Patrol and Investigation <br />Everyone knows their neighbors; Low <br />crime Measured Code satisfaction l rates; <br />Measured satisfaction levels. <br />1. Evaluate shared services options for law enforcement and communications <br />2. Body Cams for Police Officers <br />3. Complete evaluation of service level standards and their effectiveness in determining <br />whether we have a good agreement with the County <br />Complete PD Master Plan including needed resources for service we want. <br />Code Enforcement <br />1. ID properties with chronic violations and implement proactive enforcement to maintain <br />compliance <br />2. Noise ordinance <br />Municipal Court <br />Specific actions to increase collaboration between staff in PD and Court. <br />Parks <br />Parks <br />Maintained to established criteria; <br />Maintain tree inventory; Moving to <br />desired level of tree diversity; Stable or <br />declining cost per acre; Measured <br />satisfaction levels. <br />1. Implement Wayfinding <br />2. Implement ADA playground replacements <br />Forestry <br />Ongoing replacement of ash trees and those damaged due to severe weather change in <br />November of 2014 <br />Horticulture <br />1. Develop landscaping standards <br />2. Prioritized plan to replace dated and damaged landscaping <br />Cemetery <br />Open Space & Trails <br />Acquisition <br />Maintained to established criteria; Cost <br />per acre and per mile; Measured <br />satisfaction levels; Productive <br />relationships with owners of candidate <br />properties. <br />Pursue preferred acquisitions as become available <br />Maintenance and Management <br />1. Eradicate List A Noxious Weeds <br />2. Complete (or show good progress) zone districts <br />Education and Outreach <br />Train with PD on Comprehensive Coyote Mgt Plan <br />Trail Maintenance <br />Maintenance and repair to existing trails due to usage and weather <br />New Trails <br />Implement Wayfinding <br />Youth Activities <br />Participation rates; Fees reflect adopted <br />Submit proposed tax measure to voters for Recreation /Senior Center expansion and /or new <br />Adult Activities <br />2016 01 26 Retreat 02 Prgrams & Contributing Projects Retreat Discussion Draft <br />7 <br />Page 1 of 2 1/22/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.