Five -Year Capital Improvement Program <br />Request for Capital Equipment or Capital Improvement Project <br />Project or Equipment Identification <br />Project Nemo: Improvomonts at ommunity 'og •ark <br />Version of Roquost: 7/28/2015 <br />Submitting Dopartmont/Divislon: Parks & Rocroation <br />Impacted DopartmontslDivisions: <br />Funding Sourco(s): <br />Conservation Trust - Lottery <br />Total Funding <br />Dopartment Priority <br />Estimated Expenditure Schedule <br />qulpment or <br />Projoct Costs <br />ear 1 <br />'oar 'oar 3 'ear4 <br />2016 2017 2018 <br />2019 <br />ear 5 <br />2020 <br />ive- ear <br />Total <br />: oyon• <br />5 Yoars <br />Land Acquisition <br />Design & Engineering <br />Other Prof Services <br />Percent Construction <br />100% Other <br />Capital Equipment <br />7,500 <br />50,000 40.000 <br />150.000 247,500 <br />Total Projoct Costs <br />Grant(s) or Othor <br />Projoct Revenue <br />100% . Impact to Annual <br />25 Main /Op Costs <br />7,500 <br />50.000 40.000 <br />150.000 247.500 <br />1,000 <br />1,000 <br />1,000 <br />1,000 <br />4,000 <br />1.000 <br />Project Location Map, Equipment Identification Photo, or Other <br />wawa re <br />r. <br />ft <br />Project or Equipment Description and Justification <br />Please provide a general project description and includo the cost allocation methodology <br />if moro than ono funding source is requested: <br />Proposed improvements at Community Park Dog Park could include tho following projects <br />in priority order (yearly project budgots shown above in the same order): establish a small <br />dog area, construct and modify tho stone retaining wall around tho pond, install a sholtor, <br />and installation of synthetic turf for dogs. <br />Please describe why this project is needed, how it supports Citywide goals and <br />objectives, what realistic options or alternatives have bean considered, and what payback. <br />or rotum on investmont, has been calculated: <br />The dog park at Community Park is a highly valued and used amenity by tho residents of <br />Louisville. Additional Improvements aro proposed to bettor meet the needs of those using <br />the facility. <br />In the past bluegrass sod had been Installed two times and has failed each time and staff <br />decided to Install crusher fines as a baso motorist. With tho growth of dog parks and the <br />dovotopmont of synthetic turf, artificial turf in dog parks is becoming a popular and <br />acceptable surface. Synthetic turf provides for a surface that is relatively easy to maintain <br />and will add to tho ovorall experience of the dog and dog owners. <br />The existing shelter is fairly small and not able to provide shade for the growing number of <br />pooplo and dogs. An additional sholtor will provide shade options and protection from the <br />sun. <br />The existing retaining wall around the pond helps to control mud around the edges of the <br />pond however; the sides of the pond aro fairly steep resulting In erosion of the banks into <br />the pond. Modifying the retaining wall to make it higher will allow for the banks to be mado <br />lovol and reducing erosion of the banks In to the pond. <br />With the growing popularity of dog parks thorn is a corresponding call for separate areas <br />for use by small dogs or by those want a moro intimate space for training and socializing <br />thoir dogs. <br />Option Is to not Install tho proposod Improvements and to continuo to utilize facility as is. <br />Please provide a description of any grants andlor othor rovenuo associated with this <br />project and the ongoing operational and / malntenanco costs associated with this project.: <br />Annual maintenance Is estimated at 51,000 <br />