Laserfiche WebLink
Task Force <br /> Meeting Minutes <br /> June 15th, 2016 <br /> Page 2 of 3 <br /> Council will continue to support the CIP as currently, with funds from the general <br /> fund ($125,000). The amount of$500,000 each will be funded with sales tax and <br /> be proposed to City Council to determine additional details. <br /> VII. Telephone Poll and Citizen Survey Results —The phone survey reached 400 <br /> registered voters, and provides another set of data points to consider. Results <br /> were generally favorable. Detailed results were included in the packet provided <br /> for the June 15th Task Force meeting. <br /> Maxine Most was present to voice her concern that a stand alone outdoor pool <br /> was not in the overall project design. The Task Force felt the public input <br /> process was thorough and valid when determining what amenities would be <br /> included in the conceptual designs presented. <br /> VIII. Refined Floor Plans and Cost Estimate — Sink Combs Dethlefs <br /> The shift in parking lots was discussed. There was not a cost savings by moving <br /> parking to the west, and there was concern that doing so would take out a <br /> current recreation amenity. <br /> Chris Kastelic gave an update on the LSAB meeting. They questioned how do <br /> you set up a budget without first having a list of sustainable items and solutions. <br /> He discussed solar lease options and buy back programs. <br /> Conceptual design plans were altered to include direct senior center access, <br /> partition walls, consult room was added, adjusted orientation of restrooms <br /> downstairs, patio off pool was redesigned, track will remain with the current <br /> layout with possible piece added to allow direct access to cardio area and <br /> restrooms, cardo stations will increase from 31 to 65. <br /> For Memory Square, the shell of the building will stay and modifications to the <br /> inside and outside will be made. A family changing room will be added to the <br /> north, and an exterior renderings will help visualize the look of the facilities shell. <br /> The cost of the full project now is at $28,153,309 and includes the recreation <br /> center and Memory Square. Project management fee was reduced to $392,965 <br /> (2%). <br /> The dive well was discussed and SCD presented 4 options. The 4th option was <br /> supported by the Task Force, which was the recreational option and would allow <br /> for recreation diving in aquatics area. It was suggested to explore the option of <br /> adding a climb wall to Memory Square's pool. <br /> A proposed construction plan was given by SCD. Staff will work to determine <br /> lost revenue based on the closure of areas in the facility. Sales tax would start <br /> right away, and funds streaming in could help cover the loss during construction. <br /> Michael Menaker raised the question of what if$28 million isn't enough with <br /> rising construction cost possibilities. Michele VanPelt said we would build what <br /> was proposed to the voters. Councilman Lipton said City Council could make <br /> corrections if that occurred, and he hopes to fast track the project to avoid the <br /> 3 <br />