My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2016 06 23
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2016 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2016 06 23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:10 AM
Creation date
10/14/2016 9:59:21 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2016 06 23
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />May 12, 2016 <br />Page 4 of 13 <br />Motion passes 6-0. <br />➢ 305 S Arthur Avenue Final PUD: Resolution No. 12, Series 2016. A resolution <br />recommending approval of a final Planned Unit Development (PUD) to a 17,940 SF <br />single story industrial flex building with associated site improvements on Lot 1 of the <br />Business Center at CTC, Replat E. <br />• Applicant and Representative: Etkin Johnson Real Estate Partners (Liz Cox) <br />• Owner: EJ 305 South Arthur LLC <br />• Case Manager: Lauren Trice, Planner I <br />Conflict of Interest and Disclosure: None. <br />Public Notice Certification: <br />Published in the Boulder Daily Camera on April 24, 2016. Posted in City Hall, Public Library, <br />Recreation Center, and the Courts and Police Building and ailed to surrounding property <br />owners and property posted on April 22, 2016.iiir <br />Staff Report of Facts and Issues: <br />Lauren Trice presented from Power Point: <br />• Property located between S Arthur Aven <br />• Property zoned Planned Community Zon <br />• Required to follow the IDDSG <br />• CTC Connectivity Study and thi •roject inclu <br />o Dedication of right -of- portion of <br />S Arthur Avenue <br />o Studied in CTC Connectivity Stu <br />o Alternative 2, recommended road all <br />o No final design for roadway <br />• Lot coverage (building, parking, drive <br />o Current plan: 54.3% <br />o With future road: 66 :.% <br />o IDDSG: maximu <br />• Side setback: <br />d 96th Street <br />rict-Industrial (PCZD-I) <br />• <br />• <br />• <br />• <br />• <br />• <br />• <br />t pla <br />o IDDS <br />parking (4 sp <br />ss points: <br />Current plan: <br />o ith future r <br />Tempo ry sidewa <br />Concrete tilt -up pa <br />ide setbac <br />5' <br />e <br />three <br />e redesigned with future road construction <br />s and aluminum storefront windows <br />ffice) <br />re road connecting 96th Street to <br />Varied roof line between 24-27 feet <br />IDDSG allows for 40 feet <br />Main entrance accented with blue panels, 27 foot parapet and horizontal steel canopy <br />The applicant is requesting the following waivers: <br />o An additional monument sign along the future road to be installed after the road <br />is constructed. <br />o Three surface mounted signs, where one per street frontage is allowed, totaling <br />120 SF, where 80 SF is allowed, with a maximum character height of 24 inches, <br />where 18 inches is allowed. <br />o A decrease in the side -yard setback from a local public street from 30 feet to 15 <br />feet when the future road is constructed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.