Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />June 23, 2016 <br />Page 11 of 30 <br />Vasbinder continues. In 1980 when the CTC was developed, there were certain areas zoned <br />commercial and certain areas designated industrial. There is a recorded document that says <br />this. However, the exhibit that was attached to that about which areas are which is nowhere to <br />be found, and not part of the recorded document at the County. We have done title searches. <br />While I will not argue with Robinson that 40 years ago, there was commercial, I am not <br />convinced it was this spot. When we did the Business Center in 1998, we created this northern <br />tier and it was requested by the City that we create these two different zones. We had the <br />commercial zone along Highway 42 and had the industrial zone which was the balance of the <br />property at CTC. When we did Filing 2 in early 2002, it is the property that goes down to Dillon <br />Road, and the majority of that property was industrial. The corner piece that Robinson <br />indicated is at the intersection of 104th and Dillon Road and is the City Service Center. It was a <br />piece within Filing 2 that is commercial. All the rest of the Filings (we are up to Filing 4) are <br />industrial. The PC was gracious enough to approve the rezoning on the parcel we call 2000 <br />Taylor, which is the building currently under construction. That building is about 120,000 SF. I <br />can tell you today that we have two active leases for the whole building. That is what's <br />happening in the CTC. I cannot announce the two tenants, but you will be satisfied with the <br />employment group. What we'd like to do in this particular rezoning is to take the 8 acres which is <br />PCZD-C and create the PCZD-I and use the IDDSG for the development of this property. There <br />are two things that are particular about this. The properties that front 104th Street that we have <br />built have a 54' easement on the west side of 104th Street. It gives us an additional buffer which <br />we use for landscaping and detention ponds. For this particular property at the corner, the <br />easement runs along both the north side and the east side of this property. It essentially <br />negates about 1.5 acre out of the 8 acres to be non -developable. We have more setback which <br />we agreed to in 1998, and it gives us more room to create some landscaping and berms, and <br />provide additional buffering along Highway 42. Since 1998, we have actively tried to market this <br />property as commercial. We see some benefit to that as well since there is a large daytime <br />employment base. Since 1998, we have not had one request or a proposal to build a building to <br />lease to any commercial users. The problem is that it is a daytime employment base and there <br />is no developable land to the north, which the City cemetery and open space. Everything to the <br />east is open space to almost Highway 287 where there is a subdivision. When we built the <br />Lafayette Corporate Campus and the hospital, we faced the same issues about trying to get <br />retail along Highway 287, which has a substantially higher traffic volume. We were never <br />successful. We have a cafe at Lafayette Corporate Campus that we subsidize and have for 10 <br />years. It is a benefit to our tenants. There is retail now happening north of the hospital because <br />there is some residential. We are asking for rezoning. I passed out a conceptual plan of this <br />property that we are working on with an international user. We have not signed a transaction <br />because we can't build this building due to zoning. This user has expressed a desire to be at <br />this location. It is a well-known company which I cannot state. They have expressed a desire to <br />vacate a location in one of the neighboring cities and relocate their operation here. We are <br />coming to you for rezoning because we have active interest on this property. We will still build <br />the building even if the transaction falls through. Over the last 5 or 6 years at the CTC, it is build <br />it and they will come. We continue to have that success based on the services the City provides, <br />the opportunity for housing, the retail in the area, and the attributes we love about the northern <br />part of the City. <br />Commission Questions of Applicant: <br />Hsu says in your letter, you state you do not think the CDDSG are feasible with your intended <br />use. Yet Staff mentions that there are two buildings that do comply with them. Can you speak <br />about why you cannot comply? <br />Vasbinder says the Lockheed building is a two-story office building with very little service area. <br />They have one loading dock for their products. The Pearl Izumi building is an office building. It is <br />their marketing center. We sold that property to them and they built their building. We think it is <br />a great addition to the park. It is not a service building but an office building. Our buildings are <br />