My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Space Advisory Board Agenda and Packet 2017 02 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
OPEN SPACE ADVISORY BOARD
>
2000-2019 Open Space Advisory Board Agendas and Packets
>
2017 Open Space Advisory Board Agendas and Packets
>
Open Space Advisory Board Agenda and Packet 2017 02 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:21:25 AM
Creation date
2/16/2017 11:55:26 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
OSABPKT 2017 02 08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LEGEND <br />pm <br />F <br />— SAN <br />—ST <br />4eFH <br />LP <br />6. <br />50 <br />51 <br />DOMESTIC WATER <br />FIRE (DOMESTIC) <br />WATER LINE <br />SANITARY SEWER <br />STORM SEILER <br />FIRE HYDRANT <br />PARKING LOT LIGHT <br />ACCESSIBLE PARKING <br />PARKING COUNT NO. <br />PARKIN TALLY <br />PROPERTY LINE <br />EASEMENT LINE <br />FIRE LANE () <br />EXIST. CONTOUR LANE <br />NEW CONTOUR LIME <br />i--7 <br />30' SIGHT TRIANGLE <br />I / <br />aHNSOMMI <br />...r_arlsIsrr <br />rrrsRrr rr <br />COLORED/SCORED <br />CONCRETE <br />(CROSS WALK) <br />H.C. CURB RANT' <br />PARKING ABBREVIATIONS <br />HC = HC ACCESSIBLE 9' x I9' <br />IITI4 5' ACCESS AISLE <br />PARKING COUNTS <br />COAL CREEK <br />BUSINESS <br />PARK <br />COAL CREEK <br />CORPORATE <br />CENTER I <br />SITE <br />FINAL PLANNED UNIT DEVELOPMENT <br />COAL CREEK CORPORATE CENTER 1, AMENDMENT A <br />COAL CREEK BUSINESS PARK <br />LOT 2, COAL CREEK BUSINESS PARK <br />CITY OF LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO <br />VICINITY MAP <br />SCALE: N.1J5. <br />PARKING REQUIRED = 483 (4:1,000 GSF) <br />TOTAL PARKING PROVIDED - LOT 2 = 327 <br />314 STANDARD SPACES <br />13 COMPACT SPACES <br />TOTAL PARKING SURPLUS - LOTS 1,5,6 = 26 <br />TOTAL PARKING PROVIDED = 353 <br />PARKING RATIO - LOT 2: 2.71 / 1,000 G.S.F. <br />PARKING RATIO - W/ SURPLUS: 2.93 / 1,000 G.S.F. <br />ACCESSIBLE PARKING REQUIRED = 9 <br />ACCESSIBLE PARKING PROVIDED = 10 <br />BICYCLE PARKING REQUIRED = 20 <br />EXISTING BICYCLE PARKING = 13 <br />NEW BICYCLE PARKING = 10 <br />BICYCLE PARKING PROVIDED = 23 <br />1/ <br />/ <br />- --SS- <br />�. 1\17 /•1 <br />1 <br />–, - , .. <br />...-}1_— <br />I <br />NEW PARKING (TYP) <br />EXISTING PARKING <br />120.00 <br />EXISTING STRUCTURE <br />I PHASE 2 <br />EXISTING 4 BIKE <br />BIKE RACK <br />BUILDING DATA BLOCK <br />CORPORATE CENTER I <br />USE: OFFICE USAGE <br />PHASE 1 G.F.A. = 100,540 S.F. <br />PHASE 2 G.F.A. = 120,540 5.F. <br />PHASE 1 FOOTPRINT = 50,649 S.F. <br />PHASE 2 FOOTPRINT = 60,649 S.F. <br />HEIGHT = 34'-6" <br />(2 -FLOORS TO PARAPET) <br />PHASE 1 FAR = 39.67% <br />PHASE 2 FAR = 47.56% <br />PHASE 1 OPEN SPACE = 29.90% <br />PHASE 2 OPENSPACE = 25.60% <br />EXISTING PARKING <br />218.81 <br />BIKE RACK (TYP) <br />RELOCATED 9 STALL BIKE RACK <br />EXISTING PARKING <br />SHARED PARKING SIGN FOR COAL CREEK <br />TRAIL ACCESS WILL BE AVAILABLE FOR <br />USAGE BY PERSONS DURING EVENINGS <br />(AFTER 5 PM UNTIL SUNSET ) & WEEKEND <br />SITE PLAN PHASE 2 <br />NEW PARKING <br />SHARED PARKING SPACES FOR COAL <br />CREEK TRAILHEAD ACCESS WILL BE <br />AVAILABLE FOR USAGE BY PERSONS <br />DURING EVENINGS (AFTER 5 PM UNTIL <br />SUNSET) & WEEKENDS <br />NEW PARKING (TYP) <br />SHARED PARKING SIGN <br />FOR COAL CREEK TRAIL <br />ACCESS (1 OF 8) - <br />SPECIFICATIONS AND <br />SIGNS TO BE PROVIDED BY <br />THE CITY AND INSTALLED <br />BY THE PROPERTY OWNER <br />COMPACT PARKING SPACES <br />CRUSHER FINES TRAIL HEAD CONNECTOR. <br />CONSTRUCTED PER CITY OF LOUISVILLE'S TRAIL DETAIL <br />AND CRUSHER FINES GRAVEL PATH SPECIFICATION. <br />0' 15' 30' <br />60' <br />SCALE: 1" = 30' - 0' <br />NORTH <br />RECONSTRUCTED CRUSHER FINES TRAIL. CONSTRUCTED <br />PER CITY OF LOUISVILLE'S TRAIL DETAIL AND CRUSHER <br />FINES GRAVEL PATH SPECIFICATION. 200 FOOT SETBACK SHALL BE <br />MAINTAINED FROM US 36 <br />• <br />• <br />• <br />• <br />Emma. <br />imago <br />ilii■ <br />DAVIS <br />PARTNERSHIP <br />ARCHITECTS <br />ARCHITECT <br />DAVIS PARTNERSHIP ARCHITECTS <br />2901 BLAKE STREET, SUITE 100 <br />DENVER, CO 80205 <br />PHONE. 303.861.8555 <br />LANDSCAPE ARCHITECT <br />DAVIS PARTNERSHIP ARCHITECTS <br />2901 BLAKE STREET, SUITE 100 <br />DENVER, CO 80205 <br />PHONE 303.861.8555 <br />CIVIL ENGINEER <br />MARTIN/MARTIN, INC. <br />12499 W COLFAX AVE <br />LAKEWOOD, CO 80215 <br />PHONE: 303.431.6100 <br />Q <br />z <br />w a <br />2 N <br />Z <br />wZ <br />Q (7) <br />cc COD <br />W <br />W <br />ZW <br />W ri <br />0 <br />W J <br />as <br />re O <br />0 <br />a <br />CC N <br />OI— <br />� <br />J <br />Date: 1/28/98 <br />Proj. No.: 16106.01.000 <br />Issued/Revised <br />DATE <br />PUD Submittal <br />02.23,98 <br />Final PUD Submittal <br />04,13,98 <br />Final PUD <br />05.28.98 <br />PUD AMENDMENT A, <br />FIRST SUBMITTAL <br />08,01.16 <br />PUD AMENDMENT A, <br />SECOND SUBMITTAL <br />10,14,16 <br />PUD AMENDMENT A, <br />THIRD SUBMITTAL <br />12.16.16 <br />PUD AMENDMENT A, <br />FOURTH SUBMITTAL <br />01.27.17 <br />DRAWING TITLE: <br />SITE PLAN PHASE 2 <br />SHEET NUMBER: <br />03 <br />03of16 <br />AMENDMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.