Laserfiche WebLink
$833,0281 <br />Arterials <br />Allocation Factors for Arterials <br />Existing Arterial Lane Miles <br />2016 VMT <br />Level -of -Service (LOS) Standards <br />28.79 <br />207,319 <br />LOS: Arterial Lane Miles per 10,000 VMT I 1.389 <br />Cost Basis from Planned Projects <br />Removing Cannon Drive and CTC <br />Connector projects decreased average <br />lane mile cost from $900k to $833k. <br />Project <br />Kaylix Avenue Extension North <br />Kaylix Avenue Extension South <br />SH 42 Corridor Improvements <br />Lane1 <br />Additional Cost per <br />Miles Lanes Miles Capacity VMC Lane Mile <br />MEMMMKIEN <br />MIEEMEME111 <br />0.13 <br />0.25 <br />14.400 <br />1.440 <br />$1,750,000 <br />Total <br />Cost <br />$350,000 <br />14.400 <br />1,800 <br />$1,800,000 <br />$450,000 <br />14,400 <br />36,000 <br />$748,000 <br />$3,740,000 <br />TOTAL <br />Average Cost per Lane Mile <br />2.73 5.45 43,200 39,240 <br />Average Cost per VMT <br />I $115.70 <br />Growth -Related Expenditure on Arterials I $2,574,057 <br />'Source: City of Louisville, Colorado. <br />$833,028 $4,540,000 <br />$2.57 million of arterial improvements <br />based on 3.09 lane miles. <br />TischlerBise 1 www.tischlerbise.com <br />10 <br />5 <br />Travel Demand Model <br />Avg Trip Length (miles) 3.318 VMC <br />29.45% reduction in average trip <br />length reduces demand for new <br />Excess Capacity Reduction 29.45% <br />arterials to 3.09 lane miles. <br />Avg Trip Length (miles) 2.341 <br />T <br />Vehicle Capacity Per Lane 7,200 <br />2016 <br />2017 <br />2018 2019 2020 2021 2026 <br />10 -Year <br />Base <br />1 <br />2 <br />3 <br />4 <br />S <br />10 <br />Increase <br />Single -Family Housing Units <br />7,086 <br />7,171 <br />7,255 <br />7,339 <br />7,425 <br />7,472 <br />7,685 <br />599 <br />Multi -Family Housing Units <br />1,844 <br />1,862 <br />1,880 <br />1,898 <br />1,915 <br />1,924 <br />1,968 <br />124 <br />Commercial KSF <br />Office KSF <br />Institutional KSF <br />Industrial KSF <br />1,452 <br />2,170 <br />566 <br />2,719 <br />1,486 <br />2,221 <br />580 <br />2,784 <br />1,522 <br />2,274 <br />594 <br />2,850 <br />1,558 <br />2,328 <br />609 <br />2,918 <br />1,595 <br />2,383 <br />623 <br />2,987 <br />1,610 <br />2,405 <br />629 <br />3,014 <br />1,682 <br />2,512 <br />658 <br />3,147 <br />230 <br />342 <br />92 <br />428 <br />Single -Family Trips <br />Multi -Family Trips <br />41,967 <br />7,065 <br />42,472 <br />7,135 <br />42,970 <br />7,202 <br />43,467 <br />7,272 <br />43,977 <br />7,335 <br />44,255 <br />7,371 <br />45,516 <br />7,539 <br />3,549 <br />475 <br />Residential Trips <br />49,032 <br />49,607 <br />50,172 <br />50,739 <br />51,312 <br />51,626 <br />53,056 <br />4,023 <br />Commercial Trips <br />Office Trips <br />Institutional Trips <br />Industrial Trips <br />20,460 <br />11,968 <br />4,367 <br />5,193 <br />20,939 <br />12,249 <br />4,475 <br />5,317 <br />21,447 <br />12,541 <br />4,583 <br />5,444 <br />21,954 <br />12,839 <br />4,698 <br />5,573 <br />22,475 <br />13,142 <br />4,806 <br />5,705 <br />22,687 <br />13,264 <br />4,853 <br />5,757 <br />23,701 <br />13,854 <br />5,076 <br />6,011 <br />3,241 <br />1,886 <br />710 <br />817 <br />Nonresidential Trips <br />41,988 <br />42,980 <br />44,014 <br />45,065 <br />46,129 <br />46,560 <br />48,642 <br />6,654 <br />Total Vehicle Trips <br />91,020 <br />92,587 <br />94,186 <br />95,804 <br />97,441 <br />98,185 <br />101,698 <br />10,678 <br />Vehicle Miles of Capacity (VMC) <br />293,843 <br />298,445 <br />303,098 <br />307,804 <br />312,562 <br />314,814 <br />325,365 <br />31,522 <br />Vehicle Miles of Travel (VMT) <br />207,319 <br />210,566 <br />213,849 <br />217,169 <br />220,526 <br />222,115 <br />229,559 <br />22,240 <br />ARnri,l l me Mflmc MAC) <br />An 91 <br />Al AS <br />Al 111 <br />A770 <br />43 Al <br />A377 <br />AS 10 <br />A 32 <br />Arterial Lane Miles (VMT) <br />28.79 <br />29.25 <br />29.70 <br />30.16 <br />30.63 <br />30.85 <br />31.88 <br />3.09 <br />S;5„eli..eel 1..L...c,.Cens <br />1C.0 <br />11.3 <br />11.5 <br />11.0 <br />17.0 <br />17.1 <br />17.7 <br />1.7 <br />Pedestrian Improvements <br />3.7 <br />3.7 <br />3.8 <br />3.9 <br />3.9 <br />4.0 <br />4.1 <br />0.4 <br />Parking Spaces <br />271.0 <br />275.3 <br />279.5 <br />283.9 <br />288.3 <br />290.3 <br />300.1 <br />29.1 <br />Ten -Year VMT Increase => <br />10.7% <br />TischlerBise 1 www.tischlerbise.com 9 <br />Arterials <br />Allocation Factors for Arterials <br />Existing Arterial Lane Miles <br />2016 VMT <br />Level -of -Service (LOS) Standards <br />28.79 <br />207,319 <br />LOS: Arterial Lane Miles per 10,000 VMT I 1.389 <br />Cost Basis from Planned Projects <br />Removing Cannon Drive and CTC <br />Connector projects decreased average <br />lane mile cost from $900k to $833k. <br />Project <br />Kaylix Avenue Extension North <br />Kaylix Avenue Extension South <br />SH 42 Corridor Improvements <br />Lane1 <br />Additional Cost per <br />Miles Lanes Miles Capacity VMC Lane Mile <br />MEMMMKIEN <br />MIEEMEME111 <br />0.13 <br />0.25 <br />14.400 <br />1.440 <br />$1,750,000 <br />Total <br />Cost <br />$350,000 <br />14.400 <br />1,800 <br />$1,800,000 <br />$450,000 <br />14,400 <br />36,000 <br />$748,000 <br />$3,740,000 <br />TOTAL <br />Average Cost per Lane Mile <br />2.73 5.45 43,200 39,240 <br />Average Cost per VMT <br />I $115.70 <br />Growth -Related Expenditure on Arterials I $2,574,057 <br />'Source: City of Louisville, Colorado. <br />$833,028 $4,540,000 <br />$2.57 million of arterial improvements <br />based on 3.09 lane miles. <br />TischlerBise 1 www.tischlerbise.com <br />10 <br />5 <br />