Laserfiche WebLink
a <br />Ui <br />ca <br />cc <br />2 <br />LU0 <br />cc <br />cc <br />LUCD <br />DRAWINGU�UU����� <br />^~~~^~^~~~~^" <br />I. <br />I <br />LU <br />z <br />cu <br />„Limn <br />wz <br />• VS <br />coca <br />nr,551 <br />2E1 <br />QuicE <br />8 <br />P11111 1,ht ,[11 0 (11.001,10,10 111,04, .1 I 1 1111,1, I I /1, 111.(1111 <br />IP • >•:•,, <br />• • <br />w/ BULLNOSE <br />MAIN ENTRANCE ELEVATION <br />" = 101-0" <br />5' 10' 20' <br />611.emiammiii <br />T.O. PARAPET <br />T.O. PARAPET <br />• <br />U) <br />FINISH FLOOR <br />• • <br />EnDRIVE THRU ELEVATION <br />— 1" = <br />0 5' <br />10' 20' <br />Delo Plaza Building Material Palette <br />C.M.U., SPLIT FACE <br />METAL PANEL,CORRUGATED, <br />AGED METALLIC FINISH <br />BRICK, RUNNING BOND <br />STUCCO, FINE SAND TEXTURE <br />ACCENT HEADER: STEEL CHANNEL <br />ALUMINUM CLAD WINDOW FRAME <br />METAL CANOPY <br />PARAPET: METAL CAP <br />OPTIONAL <br />• <br />• <br />• <br />• <br />C.M.U., SPLIT FACE <br />METAL PANEL, <br />AGED METALLIC FINISH <br />BRICK, RUNNING BOND <br />STUCCO, FINE SAND TEXTURE <br />ACCENT HEADER <br />VINYL CLAD WINDOW FRAME <br />AWNING <br />PARAPET <br />e <br />Plaza <br />Final Planned Unit Development <br />NE 1/4 OF SECTION 8, TOWNSHIP 1 SOUTH, RANGE 69 WEST OF THE 6TH P.M. <br />CITY OF LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO <br />--- • :4," K` <br />14i0,11111111i111111441111 <br />. .„ <br />FRONT ELEVATION <br />" = <br />5' <br />10' 20' <br />4 <br />a. <br />NOTES <br />WI BULLNOSE <br />REAR ELEVATION <br />1" = 10'-0" <br />0 5' <br />10' 20' <br />1. DRIVE THROUGH/RETAIL BUILDING SHALL CONTAIN NO LESS THAN 3 <br />OF THE FINISHES AND / OR ACCENT ELEMENTS USED ON THE <br />COMMERCIAL BUILDING. <br />2. ALL MATERIALS AND COLORS FROM THE DELO PLAZA BUILDING <br />MATERIAL PALETTE ARE ELIGIBLE FOR USE WITHIN THE <br />CONSTRUCTION DOCUMENTATION PROCESS. <br />3. DRIVE THROUGH/RETAIL BUILDINGS ARE CONCEPTUAL IN NATURE. <br />FINAL DESIGN, IN COMPLIANCE WITH THIS FDP, WILL BE FINALIZED <br />AT THE TIME OF CONSTRUCTION DOCUMENT PROCESS. <br />T.O. PARAPET. <br />FINISH FLOOR <br />• <br />T.O. PARAPET <br />• <br />U) <br />FINISHFLOOR <br />00 <br />Owner <br />TEBO Properties <br />3111 28th Street <br />Boulder, CO 80301 <br />tel (303) 447-8326 <br />44 <br />Owner's Representative <br />RMCS, Inc. <br />21 South Sunset St. <br />Longmont, CO 80503 <br />tel (720) 524-3620 <br />140 <br />Engineering <br />Park Engineering Consultants <br />420 21st Ave. Suite 101 <br />Longmont, CO 80501 <br />tel (303) 651-6626 <br />Planning / LA <br />PWN Architects & Planners, Inc. <br />9250 E. Costilla Ave., Suite 620 <br />Greenwood Village, CO 80112 <br />tel (303) 649-9880 <br />Landscape Architect <br />Grounded By Design, LLC <br />P.O. Box 1953 <br />Wheat Ridge, CO 80034 <br />tel (303) 872-7807 <br />Lighting <br />RG Engineering Consultan , Inc <br />2555 Walnut St., Suite B <br />Denver, CO 80205 <br />tel (303) 355-5534 <br />Ar • <br />et) <br />• .• <br />Project: <br />Drawn By: <br />LRC <br />JL <br />Issue Date: <br />Revisions: <br />EXTERIOR ELEVATIONS - <br />DRIVE THROUGH / RETAIL <br />SHEET <br />08.15.2014 <br />11.18.2014 <br />01.08.2015 <br />05.13.2015 <br />07.14.2015 <br />6 <br />of 17 <br />