Laserfiche WebLink
cc <br />ca <br />2 <br />LUz0 <br />CC <br />0 <br />( <br />cc <br />LU <br />co <br />z <br />CD <br />cc <br />N <br />DRAWING NUMBER <br />cO <br />N <br />0 <br />z <br />U- <br />%-• <br />.4- <br />0 <br />cn <br />U-1 <br />Cuz <br />2 LE <br />CDw- <br />Q� <br />0 g <br />w H 4 <br />z0. <br />• g <br />CD <br />C.0 <br />c.) <br />a <br />000. <br />" <br />.P <br />.A <br />-0 <br />La EC) <br />a II <br />,1 <br />I <br />Z fie 0. <br />• 9. e4 <br />t• O. <br />F- CC g <br />CJ <br />1 0 <br />Li) <br />I <br />21 0 <br />z <br />- co <br />2 s <br />2 <br />•0. <br />tofu; <br />Ow <br />Fl0 <br />2 2) I <br />se:3 <br />0 <br />k <br />2 <br />z <br />g <br />m <br />cc 5 <br />o r•-• <br />ty <br />0 <br />LU <br />CC CC <br />CO I <br />N - <br />T.O. PARAPET <br />77, <br />,:tmoluielesuionew• /41.4ta <br />FINISH FLOOR 1.114 <br />w/ BULLNOSE <br />MAIN ENTRANCE ELEVATION <br />1" = 10'-0" <br />0 5' <br />10' <br />20' <br />6111a1m6....01 <br />4 <br />DRIVE THRU ELEVATION <br />0 5' 10' 20' <br />eadmingimom <br />Delo Plaza Building Material Palette <br />.0* C.M.U., SPLIT FACE <br />METAL PANEL,CORRUGATED, <br />AGED METALLIC FINISH <br />BRICK, RUNNING BOND <br />STUCCO, FINE SAND TEXTURE <br />ACCENT HEADER: STEEL CHANNEL <br />ALUMINL' CLAD WINDOW FRAME <br />METAL C OPY <br />PARAPE METAL CAP <br />111111111 <br />OPTIONAL <br />• <br />C.M.U., SPLIT FACE <br />METAL PANEL, <br />AGED METALLIC FINISH <br />BRICK, RUNNING BOND <br />STUCCO, FINE SAND TEXTURE <br />ACCENT HEADER <br />VINYL CLAD WINDOW FRAME <br />AWNING <br />PARAPET <br />Plaza <br />Final Planned Unit Development <br />NE 1/4 OF SECTION 8, TOWNSHIP 1 SOUTH, RANGE 69 WEST OF THE 6TH P.M. <br />CITY OF LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO <br />V?•••", • ' ‘„. <br />FRONT ELEVATION <br />" = <br />5' 10' <br />20' <br />w/ BULLNOSE <br />-4--REAR ELEVATION <br />1" = 10'-O" <br />0 5' 10 20' <br />61161"%mimmiJ <br />NOTES <br />1. THROUGH/RETAIL BUILDING SHALL CONTAIN NO LESS THAN 3 <br />OF HE FINISHES AND / OR ACCENT ELEMENTS USED ON THE <br />CON6,ERCIAL BUILDING. <br />2. AL IA.TERIALS AND COLORS FROM THE DELO PLAZA BUILDING . <br />MA --AL PALETTE ARE ELIGIBLE FOR USE WITHIN THE <br />CON : RUCTION DOCUMENTATION PROCESS. <br />3. <br />DRIVL. THROUGH/RETAIL BUILDINGS ARE CONCEPTUAL IN NATURE. <br />FINAL DESIGN IN COMPLIANCE WITH THIS FDP, WILL BE FINALIZED <br />AT THE TIME OF CONSTRUCTION DOCUMENT PROCESS. <br />T.O. PARAPET <br />• <br />FINISH FLOOR <br />• <br />r.o. PARAPET <br />N - <br />FINISH FLOOR <br />• <br />Owner <br />TEBO Properties <br />3111 28th Street <br />Boulder, CO 80301 <br />tel (303) 447-8326 <br />Owner's Representative <br />RMCS, Inc. <br />21 South Sunset St. <br />Longmont, CO 80503 <br />tel (720) 524-3620 <br />Engineering <br />Park Engineering Consultants <br />420 21st Ave. Suite 101 <br />Longmont, CO 80501 <br />tel (303) 651-6626 <br />Planning / LA <br />PWN Architects & Planners, Inc. <br />9250 E. Costilla Ave., Suite 620 <br />Greenwood Village, CO 80112 <br />tel (303) 649-9880 <br />Landscape Architect <br />Grounded By Design. LLC <br />P.O. Box 1953 <br />Wheat Ridge, CO 80034 <br />tel (303) 872-7807 <br />Lighting <br />RG Engineering Consultan& Inc <br />2555 Walnut St., Suite B <br />Denver, CO 80205 <br />tel (303) 355-5534 <br />Project: <br />Drawn By: <br />LRC <br />JL <br />Issue Date: <br />Revisions: <br />EXTERIOR ELEVATIONS - <br />DRIVE THROUGH / RETAIL <br />SHEET <br />08.15.2014 <br />11.18.2014 <br />01.08.2015 <br />05.13.2015 I <br />07.14.2015 I <br />7 <br />of 17 <br />