Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />May 11, 2017 <br />Page 9 of 18 <br />o City: 14,716 sf <br />• Review plat to create the new lots <br />• PUD only applicable to the commercial development (Lot 1) <br />• Currently not reviewing development plans for the City -owned property <br />o Intention for additional parking to this parking <br />o Conceptual design will increase parking spaces, 25 existing to 38 spaces <br />• Downtown Design Handbook <br />o Core area <br />o Transition area <br />■ Project straddles this area, 1/3 with Core, 2/3 within Transition <br />• Commercial development will occur in Core and Transition <br />o Transition will step down as it gets closer to residential <br />o Architect worked to design a building that fit within the intent of the Core <br />and Transition design guidelines <br />Density <br />• Downtown Framework Plan, part of Comprehens*e Flan, advisortcument not <br />regulatory, establishes density framework we evaluate <br />Floor Area Ratio <br />Weighted Average <br />Setbacks <br />Front <br />Rear <br />Side <br />City Standards <br />Core <br />2.0 <br />Transition <br />1.3 <br />1.53 <br />Required <br />0' <br />20' <br />0' <br />Proposed <br />Propose <br />Core <br />1.2 <br />Transition <br />1.5 <br />1.45 <br />2'-6" to 3'-10" <br />0' <br />6'-6" to 6'-6" <br />• There will be streetlights and street trees along the sidewalk. To have enough width to <br />meet ADA accessibility requirements, the building needed to be "pushed" back from the <br />property line. The front setback ranges from 2'6" to 3'10". It is closer in the Core area but <br />set back more in the Transition area. <br />• The intention of the 20' rear setback is to provide for adequate parking spaces. With this <br />land exchange agreement, the applicant requests that not provide parking on site; <br />instead pay the fee -in -lieu. <br />• The LMC has parking area calculations to be used to determine the number of parking <br />spaces required. The calculation from the architect determines that 13 spaces are <br />required. <br />• The LMC does allow the fee -in -lieu to be paid. There is a provision in the land exchange <br />contract that they will pay the fee -in -lieu as established by CC resolution or an amount of <br />over $7,000 per space (whatever is less). CC is currently considering the fee -in -lieu rate <br />but it has not been determined. In anticipation of the rates changing, there is an <br />agreement that the maximum will be a little over $7,000 per space. <br />• The applicant has requested a waiver to the 20' rear setback to facilitate the design <br />guidelines and facilitate the intent of the land exchange so the City will have the <br />additional parking area. <br />Design Standards for all development Downtown, Core area and Transition area <br />11 <br />